![]() | Oracle System Handbook - ISO 7.0 May 2018 Internal/Partner Edition | ||
|
|
![]() |
||||||||||||||||
Solution Type Technical Instruction Sure Solution 2402082.1 : How to Replace an Exadata X7-2 Storage Cell Server Internal Cables
In this Document
Oracle Confidential PARTNER - Available to partners (SUN). Applies to:Exadata X7-8 Hardware - Version All Versions to All Versions [Release All Releases]Zero Data Loss Recovery Appliance X7 Hardware - Version All Versions to All Versions [Release All Releases] Oracle SuperCluster M8 Hardware - Version All Versions to All Versions [Release All Releases] Exadata X7-2 Hardware - Version All Versions to All Versions [Release All Releases] Information in this document applies to any platform. GoalHow to Replace an Exadata X7-2 Storage Cell Server Internal Cables SolutionDISPATCH INSTRUCTIONS
FIELD ENGINEER/ADMINISTRATOR INSTRUCTIONS PROBLEM OVERVIEW: An Exadata X7-2 Storage Cell Server has a faulted internal cable that needs replacement WHAT STATE SHOULD THE SYSTEM BE IN TO BE READY TO PERFORM THE RESOLUTION ACTIVITY?: IMPORTANT NOTE TO TSC ENGINEER: CUT & PASTE the “CUSTOMER ACTIVITY” sections of the Pre-Replacement and Post-Replacement steps into a SR Note and ensure the customer is aware to do these steps prior to the scheduled field engineer activity, and during and after the replacement activity. CUSTOMER ACTIVITY: Shutdown of the storage cell is required prior to the part replacement: Complete Steps 1 to 6 of Note ID 1188080.1 “Steps to shut down or reboot an Exadata storage cell without affecting ASM”. Where noted, the SQL, CellCLI and commands under ‘root’ should be run by the Customers DBA, unless the Customer provides login access to the Field Engineer These steps are also provided in the documentation:
WHAT ACTION DOES THE FIELD ENGINEER/ADMINISTRATOR NEED TO TAKE?: Prepare the Server for Service The customer should have already prepared the server and powered it off. If not, provide them the instructions in the previous section. 1. Extend the server to the maintenance position Caution - Ensure that all power is removed from the server before removing or installing the cables. You must disconnect the power cables from the system before performing these procedures.
Caution - These procedures require that you handle components that are sensitive to electrostatic discharge. This sensitivity can cause the component to fail. To avoid damage, ensure that you follow safe anti-static practices.
The following cables are included in the Oracle Server X7-2L Cable Kit - 7344289 [F] Cable Kit:
7315469 11-pin Front Interface Module Cable - use the replacement procedure detailed in Doc ID 2359465.1.
Replacing the Disk Backplane DC Power Cable 7315471 10-Pin DC Power Cable Removal: 2. Open the latch on the SuperCap tray and swing it up from the air baffle. 3. Lift up and remove the air baffle. 4. Unlatch and disconnect the cable at the disk backplane, and at the power supply riser board. 5. Lift up and remove the cable from the routing channel in the middle of the server. Installation: 2. Connect the cable at the disk backplane, and at the power supply riser board 3. Lower the air baffle back into place over the DIMMs and CPU's. 4. Lower and clip the SuperCAP tray back into the air baffle. 5. Install Fan Module 2. The fan module is keyed to ensure it is installed in the correct orientation. Press down on the fan module to fully seat the fan module.
7315475 6-Pin PCI Express Power Cable - this cable is not used in Exadata X7-2 Storage Cell Server configurations
Replacing the Temperature Sensor Cable 7315479 3-Pin Temperature Sensor Cable - use the replacement procedure detailed in Doc ID 2359483.1.
Replacing the Disk Backplane Data Cable 7344627 34-Pin Backplane Data Cable Removal: Note - You might need to disconnect the SAS cable connections from the Oracle Storage 12 Gb SAS PCIe RAID HBA, Internal card in PCIe slot 11 to access the disk backplane data cable motherboard connection. To ease removal of the cable, slightly lift the SAS cable bundles from the cable trough along the left side of the chassis. 2. Unlatch the disk backplane data cable from the disk backplane connector slot. 3. Carefully lift up and remove the cable from along the left chassis wall and out of the chassis. Installation: 2. Latch the disk backplane data cable to the disk backplane connector slot. Press to ensure the latch locks are closed. 3. Latch the disk backplane data cable to the motherboard connector slot. Press to ensure the latch locks are closed.
Replacing the Serial Management Cable 7348058 Serial Management Cable Removal: 2. Unlatch the RJ45 end from the socket. 3. Lift up and remove the cable. Installation: 2. Route the cable in between the M2 Risers and around to the motherboard connector. 3. Carefully push the cable into the connector housing.
Return the Server to Operation 1. Install the server top cover. Use a Torx T10 screwdriver to lock the release button latch.
OBTAIN CUSTOMER ACCEPTANCE FIELD SERVICE ENGINEER and CUSTOMER ACTIVITY: 1. Verify all expected hardware is visible to the server and the fault is cleared. Assistance from the customer for server login access will be required. 2. Verify there are no outstanding faults in ILOM: # ipmitool sunoem cli 'show faulty'
Connected. Use ^D to exit. -> show faulty Target | Property | Value -------------------+-----------------------+----------------------------------- -> Session closed If there are faults still outstanding that did not auto-clear in ILOM after replacement, refer to the post-repair procedures section of Doc ID 1155200.1 to clear the fault. 3. Verify there are no outstanding alerts in the Cell: # cellcli -e list alerthistory
4. Re-activate the Storage Cell grid disks. Follow Steps 7 to 10 of Note ID 1188080.1 “Steps to shut down or reboot an Exadata storage cell without affecting ASM”. Where noted, the SQL, CellCLI and commands under ‘root’ should be run by the Customers DBA, unless the Customer provides login access to the Field Engineer. These steps are also provided in the documentation:
7344289 [F] Cable Kit
REFERENCE INFORMATION: Oracle Exadata Database Machine Maintenance Guide: https://docs.oracle.com/cd/E80920_01/DBMMN/maintaining-exadata-storage-servers.htm#DBMMN21128 Oracle Server X7-2L Documentation: https://docs.oracle.com/cd/E72463_01/index.html Steps to shut down or reboot an Exadata storage cell without affecting ASM (Doc ID 1188080.1)
Attachments This solution has no attachment |
||||||||||||||||
|