![]() | Oracle System Handbook - ISO 7.0 May 2018 Internal/Partner Edition | ||
|
|
![]() |
||||||||||||||
Solution Type Technical Instruction Sure Solution 2379758.1 : Eagle: E3534 Cmd Rej: E1 Port Test Command In Progress
In this Document
Created from <SR 3-16942335451> Applies to:Oracle Communications EAGLE (Software) - Version EAGLE 46.3 and laterTekelec Goal
How to resolve the error code:
> rept-stat-e1:loc=<CardLocation> Eagle 18-02-25 15:20:24 IST EAGLE 46.3.1.0.0-68.30.1 Command Accepted - Processing Command Completed. Eagle 18-02-25 15:10:57 IST EAGLE 46.3.1.0.0-68.30.1 Command Accepted - Processing Command Completed. Eagle 18-02-25 15:11:14 IST EAGLE 46.3.1.0.0-68.30.1 E3534 Cmd Rej: E1 Port test command in progress
SolutionThis Error Code indicates that a port test is in progress on the specified E1 port. Only one port test can be performed at a time. Here we can see that AST status is FE PAYLD >>>> (FAR END PAYLOAD LOOPBACK) which means that the entity is in far end payload loop back. <Card Location> 4 IS-NR Avail FE PAYLD From the above Capture we can confirm that the FE loop back (Far End Loop Back) is observed on the impacted node. Attachments This solution has no attachment |
||||||||||||||
|