Sun Microsystems, Inc.  Oracle System Handbook - ISO 7.0 May 2018 Internal/Partner Edition
   Home | Current Systems | Former STK Products | EOL Systems | Components | General Info | Search | Feedback

Asset ID: 1-71-2359465.1
Update Date:2018-05-22
Keywords:

Solution Type  Technical Instruction Sure

Solution  2359465.1 :   How to Replace an Exadata X7-2 Storage Cell Server Front Indicator Module and/or Cable  


Related Items
  • Exadata X7-2 Hardware
  •  
  • Oracle SuperCluster M8 Hardware
  •  
  • Exadata X7-8 Hardware
  •  
  • Zero Data Loss Recovery Appliance X7 Hardware
  •  
Related Categories
  • PLA-Support>Sun Systems>Sun_Other>Sun Collections>SN-OTH: x64-CAP VCAP
  •  




In this Document
Goal
Solution
References


Oracle Confidential PARTNER - Available to partners (SUN).
Reason: Exadata internal only for Oracle support engineers use and approved HW partners

Applies to:

Zero Data Loss Recovery Appliance X7 Hardware - Version All Versions to All Versions [Release All Releases]
Oracle SuperCluster M8 Hardware - Version All Versions to All Versions [Release All Releases]
Exadata X7-2 Hardware - Version All Versions to All Versions [Release All Releases]
Exadata X7-8 Hardware - Version All Versions to All Versions [Release All Releases]
Information in this document applies to any platform.

Goal

How to Replace an Exadata X7-2 Storage Cell Server Front Indicator Module and/or Cable.

Solution

DISPATCH INSTRUCTIONS:

WHAT SKILLS DOES THE FIELD ENGINEER/ADMINISTRATOR NEED?: Exadata X7-2 Training

TIME ESTIMATE: 60 minutes

TASK COMPLEXITY: 2

 

FIELD ENGINEER/ADMINISTRATOR INSTRUCTIONS:

PROBLEM OVERVIEW:  An Exadata X7-2 Storage Cell Server Front Indicator Module (FIM) and/or FIM Cable needs replacement

WHAT STATE SHOULD THE SYSTEM BE IN TO BE READY TO PERFORM THE RESOLUTION ACTIVITY?:

IMPORTANT NOTE TO TSC ENGINEER:  CUT & PASTE the “CUSTOMER ACTIVITY” sections of the Pre-Replacement and Post-Replacement steps into a SR Note and ensure the customer is aware to do these steps prior to the scheduled field engineer activity, and during and after the replacement activity.

CUSTOMER ACTIVITY:

Shutdown of the storage cell is required prior to the part replacement:

Complete Steps 1 to 6 of Note ID 1188080.1 “Steps to shut down or reboot an Exadata storage cell without affecting ASM”.

Where noted, the SQL, CellCLI and commands under ‘root’ should be run by the Customers DBA, unless the Customer provides login access to the Field Engineer

These steps are also provided in the documentation:
   https://docs.oracle.com/cd/E80920_01/DBMMN/maintaining-exadata-storage-servers.htm#DBMMN21128

 

WHAT ACTION DOES THE FIELD ENGINEER/ADMINISTRATOR NEED TO TAKE?:

Prepare the Server for Service

The customer should have already prepared the server and powered it off.  If not, provide them the instructions in the previous section.

1. Extend the server to the maintenance position
2. Disconnect the power cords from the power supplies.
3. Attach an anti-static wrist strap to your wrist and to a metal area on the chassis or the rack.
4. Remove the server top cover. Use a Torx T10 screwdriver to unlock the release button latch.

Caution - Ensure that all power is removed from the server before removing or installing the front indicator module. You must disconnect the power cables from the system before performing these procedures.

 

Caution - These procedures require that you handle components that are sensitive to electrostatic discharge. This sensitivity can cause the components to fail. To avoid damage, ensure that you follow anti-static practices as described in Electrostatic Discharge Safety.


Removing the Front Indicator Module and Cable

1. Disconnect the LED indicator module cable from the motherboard. Note - You might need to disconnect the SAS cable connections from the Oracle Storage 12 Gb SAS PCIe RAID HBA, Internal card in PCIe slot 11 to access the LED indicator module motherboard cable connection. To ease removal of the LED indicator module cable, slightly lift the SAS cable bundles from the cable trough along the left side of the chassis.

2. Remove the three No. 2 Phillips screws that secure the FIM cable and Temp Sensor Access cover to the chassis.

3. Lift up and remove the FIM cable and Temp Sensor Access cover from the FIM cable and Temp Sensor Access cover slot. Set aside the FIM cable and Temp Sensor Access cover.

4. Remove the two No. 2 Phillips screws that secure the LED indicator module to the server front panel.

5. Remove the LED indicator module and cable from the server front panel.

6. Remove the LED indicator module cable by carefully pulling the cable through the cable trough along the left side of the chassis.

 

Installing the Replacement Front Indicator Module and Cable

1. Unpack the replacement FIM and/or Cable.

2. Push the LED indicator module and cable through the LED housing on the server front panel.

3. Install the LED indicator module cable by carefully pulling the cable through the cable trough along the left side of the chassis. Note - To ease installation of the LED indicator module cable, slightly lift the SAS cable bundles from the cable trough along the left side of the chassis.

4. Insert and tighten the two No. 2 Phillips screws to secure the LED indicator module to the server front panel.

5. Install the FIM cable and Temp Sensor Access cover to the chassis by inserting it into the FIM cable and Temp Sensor Access cover slot being careful not to damage the temperature sensor when installing the FIM cable and Temp Sensor Access cover to the chassis.

6. Install the three No. 2 Phillips screws to secure the FIM cable and Temp Sensor Access cover to the chassis

7. Reconnect the LED indicator module cable to the motherboard. Note - You might need to disconnect the SAS cable connections from the Oracle Storage 12 Gb SAS PCIe RAID HBA, Internal card in PCIe slot 11 to access the LED indicator module motherboard cable connection.


Return the Server to Operation

1. Install the server top cover. Use a Torx T10 screwdriver to lock the release button latch.
2. Reconnect the power cords to the server power supply and connect any other cables to their original locations.
3. Return the server to the normal rack position.
4. Once the power cords have been re-attached and the ILOM has booted you will see a slow blink on the green LED for the server. Power on the
server by pressing the power button on the front of the unit.
5. Connect to the server console via the ILOM and monitor the boot.
      By default the ILOM serial console displays the primary console output.
      In the event of unexpected boot behavior, it is advisable to connect to both ILOM serial and ILOM graphics consoles at the same time and monitor.

 

OBTAIN CUSTOMER ACCEPTANCE

WHAT ACTION DOES THE FIELD ENGINEER/ADMINISTRATOR NEED TO TAKE TO RETURN THE SYSTEM TO AN OPERATIONAL STATE?:

FIELD SERVICE ENGINEER and CUSTOMER ACTIVITY:

1. Verify all expected hardware is visible to the server and the fault is cleared. Assistance from the customer for server login access will be required.

2. Verify there are no outstanding faults in ILOM:

# ipmitool sunoem cli 'show faulty'
Connected. Use ^D to exit.
-> show faulty
Target | Property | Value
-------------------+-----------------------+-----------------------------------

-> Session closed
Disconnected
#

3. Verify there are no outstanding alerts in the Cell:

# cellcli -e list alerthistory

4. Re-activate the Storage Cell grid disks.  Follow Steps 7 to 10 of Note ID 1188080.1 “Steps to shut down or reboot an Exadata storage cell without affecting ASM”.

Where noted, the SQL, CellCLI and commands under ‘root’ should be run by the Customers DBA, unless the Customer provides login access to the Field Engineer.

These steps are also provided in the documentation:
 https://docs.oracle.com/cd/E80920_01/DBMMN/maintaining-exadata-storage-servers.htm#DBMMN21128

 

PARTS NOTE:

7322171 [F] Left Front Indicator Module
7344289 [F] Cable Kit
  - 7315469 11-Pin Front Interface Module Cable, 600mm

 

REFERENCE INFORMATION:

Oracle Exadata Database Machine Maintenance Guide: https://docs.oracle.com/cd/E80920_01/DBMMN/maintaining-exadata-storage-servers.htm#DBMMN21128

Oracle Server X7-2L Documentation https://docs.oracle.com/cd/E72463_01/index.html

Steps to shut down or reboot an Exadata storage cell without affecting ASM (Doc ID 1188080.1)

 


Attachments
This solution has no attachment
  Copyright © 2018 Oracle, Inc.  All rights reserved.
 Feedback