![]() | Oracle System Handbook - ISO 7.0 May 2018 Internal/Partner Edition | ||
|
|
![]() |
||||||||||||||||
Solution Type Technical Instruction Sure Solution 2359285.1 : How to Replace an Exadata X7-2 Compute Node Server Front Indicator Module and/or Cable
In this Document
Oracle Confidential PARTNER - Available to partners (SUN). Applies to:Exadata X7-2 Hardware - Version All Versions to All Versions [Release All Releases]Zero Data Loss Recovery Appliance X7 Hardware - Version All Versions to All Versions [Release All Releases] Information in this document applies to any platform. GoalHow to Replace an Exadata X7-2 Compute Node Server Front Indicator Module and/or Cable. SolutionDISPATCH INSTRUCTIONS:
FIELD ENGINEER/ADMINISTRATOR INSTRUCTIONS: PROBLEM OVERVIEW: An Exadata X7-2 Compute Node Front Indicator Module (FIM) and/or FIM Cable needs replacement WHAT STATE SHOULD THE SYSTEM BE IN TO BE READY TO PERFORM THE RESOLUTION ACTIVITY?:
CUSTOMER ACTIVITY: Shutdown of the database node is required prior to the part replacement: If running Linux or Solaris native - follow Steps 1 to 9 of MOS Note: If running OVM then follow MOS Note: WHAT ACTION DOES THE FIELD ENGINEER/ADMINISTRATOR NEED TO TAKE?: Prepare the Server for Service The customer should have already prepared the server and powered it off. If not, provide them the instructions in the previous section. 1. Extend the server to the maintenance position Caution - Ensure that all power is removed from the server before removing or installing the front indicator module. You must disconnect the power cables from the system before performing these procedures.
Caution - These procedures require that you handle components that are sensitive to electrostatic discharge. This sensitivity can cause the components to fail. To avoid damage, ensure that you follow anti-static practices as described in Electrostatic Discharge Safety.
1. Using a Philips screwdriver, remove the two screws that secure the front indicator module (FIM) assembly to the server chassis. Note - You do not need to remove the temperature sensor from the housing.
4. Disconnect the FIM cable from the FIM assembly and set the FIM assembly aside.
1. Unpack the replacement FIM and place it on an antistatic mat.
1. Install the server top cover. Use a Torx T10 screwdriver to lock the release button latch.
OBTAIN CUSTOMER ACCEPTANCE FIELD SERVICE ENGINEER and CUSTOMER ACTIVITY: 2. Verify there are no outstanding faults in ILOM: # ipmitool sunoem cli 'show faulty'
Connected. Use ^D to exit. -> show faulty Target | Property | Value -------------------+-----------------------+----------------------------------- -> Session closed Disconnected # 3. Verify there are no outstanding alerts in the Database Node: # dbmcli -e list alerthistory
4. Re-enable and restart the Database services: If running Linux or Solaris native - follow Steps 11 to 14 of MOS Note: If running OVM then follow MOS Note:
PARTS NOTE: 7322171 [F] Left Front Indicator Module
REFERENCE INFORMATION: Oracle Exadata Database Machine Maintenance Guide: https://docs.oracle.com/cd/E80920_01/DBMMN/maintaining-exadata-database-servers.htm#DBMMN22020 Oracle Server X7-2 Documentation https://docs.oracle.com/cd/E72435_01/index.html How to shutdown the Exadata database nodes and storage cells in a rolling fashion so certain hardware tasks can be performed. (Doc ID 1539451.1) How to Shutdown and Startup Exadata compute nodes running OVM (Doc ID 2367609.1)
Attachments This solution has no attachment |
||||||||||||||||
|