Solution  2359285.1 :   How to Replace an Exadata X7-2 Compute Node Server Front Indicator Module and/or Cable  


Related Items
  • Exadata X7-2 Hardware
  •  
  • Zero Data Loss Recovery Appliance X7 Hardware
  •  
Related Categories
  • PLA-Support>Sun Systems>Sun_Other>Sun Collections>SN-OTH: x64-CAP VCAP
  •  




In this Document
Goal
Solution
References


Oracle Confidential PARTNER - Available to partners (SUN).
Reason: Exadata internal only for Oracle support engineers use and approved HW partners

Applies to:

Exadata X7-2 Hardware - Version All Versions to All Versions [Release All Releases]
Zero Data Loss Recovery Appliance X7 Hardware - Version All Versions to All Versions [Release All Releases]
Information in this document applies to any platform.

Goal

How to Replace an Exadata X7-2 Compute Node Server Front Indicator Module and/or Cable.

Solution

DISPATCH INSTRUCTIONS:

WHAT SKILLS DOES THE FIELD ENGINEER/ADMINISTRATOR NEED?: Exadata X7-2 Training

TIME ESTIMATE: 60 minutes

TASK COMPLEXITY: 2

 

FIELD ENGINEER/ADMINISTRATOR INSTRUCTIONS:

PROBLEM OVERVIEW:  An Exadata X7-2 Compute Node Front Indicator Module (FIM) and/or FIM Cable needs replacement

WHAT STATE SHOULD THE SYSTEM BE IN TO BE READY TO PERFORM THE RESOLUTION ACTIVITY?:


IMPORTANT NOTE TO TSC ENGINEER: CUT & PASTE the “CUSTOMER ACTIVITY” sections of the Pre-Replacement and Post-Replacement steps into a SR Note and ensure the customer is aware to do these steps prior to the scheduled field engineer activity, and during and after the replacement activity.

CUSTOMER ACTIVITY:

Shutdown of the database node is required prior to the part replacement:

If running Linux or Solaris native - follow Steps 1 to 9 of MOS Note:
How to shutdown the Exadata database nodes and storage cells in a rolling fashion so certain hardware tasks can be performed. (Doc ID 1539451.1)

If running OVM then follow MOS Note:
How to Shutdown and Startup Exadata database nodes running OVM (Doc ID 2367609.1)

WHAT ACTION DOES THE FIELD ENGINEER/ADMINISTRATOR NEED TO TAKE?:

Prepare the Server for Service

The customer should have already prepared the server and powered it off.  If not, provide them the instructions in the previous section.

1. Extend the server to the maintenance position
2. Disconnect the power cords from the power supplies.
3. Attach an anti-static wrist strap to your wrist and to a metal area on the chassis or the rack.
4. Remove the server top cover. Use a Torx T10 screwdriver to unlock the release button latch.

Caution - Ensure that all power is removed from the server before removing or installing the front indicator module. You must disconnect the power cables from the system before performing these procedures.

 

Caution - These procedures require that you handle components that are sensitive to electrostatic discharge. This sensitivity can cause the components to fail. To avoid damage, ensure that you follow anti-static practices as described in Electrostatic Discharge Safety.


Removing the Front Indicator Module and Cable

1. Using a Philips screwdriver, remove the two screws that secure the front indicator module (FIM) assembly to the server chassis.
2. Carefully slide the FIM assembly toward the front of the server to remove it from the chassis.
3. Using a Phillips screwdriver, remove the two screws that secure the plastic temperature sensor housing to the FIM assembly, and then detach the housing from the FIM assembly.

Note - You do not need to remove the temperature sensor from the housing.

4. Disconnect the FIM cable from the FIM assembly and set the FIM assembly aside.


Installing the Front Indicator Module and Cable

1. Unpack the replacement FIM and place it on an antistatic mat.
2. f not installed, install the FIM cable through the plastic temperature sensor housing.
3. Connect the FIM cable to the replacement FIM assembly.
4. Using a Phillips screwdriver, tighten the two screws to secure the temperature sensor housing to the FIM assembly.
5. Carefully insert the FIM assembly into the front panel of the server chassis.
6. Install and tighten the two Phillips screws to secure the FIM assembly to the server chassis.


Return the Server to Operation

1. Install the server top cover. Use a Torx T10 screwdriver to lock the release button latch.
2. Reconnect the power cords to the server power supply and connect any other cables to their original locations.
3. Return the server to the normal rack position.
4. Once the power cords have been re-attached and the ILOM has booted you will see a slow blink on the green LED for the server. Power on the
server by pressing the power button on the front of the unit.
5. Connect to the server console via the ILOM and monitor the boot.
      By default the ILOM serial console displays the primary console output.
      In the event of unexpected boot behavior, it is advisable to connect to both ILOM serial and ILOM graphics consoles at the same time and monitor.

 

OBTAIN CUSTOMER ACCEPTANCE

WHAT ACTION DOES THE FIELD ENGINEER/ADMINISTRATOR NEED TO TAKE TO RETURN THE SYSTEM TO AN OPERATIONAL STATE?:

FIELD SERVICE ENGINEER and CUSTOMER ACTIVITY:

1. Verify all expected hardware is visible to the server and the fault is cleared. Assistance from the customer for server login access will be required.

2. Verify there are no outstanding faults in ILOM:

# ipmitool sunoem cli 'show faulty'
Connected. Use ^D to exit.
-> show faulty
Target | Property | Value
-------------------+-----------------------+-----------------------------------
-> Session closed
Disconnected
#

3. Verify there are no outstanding alerts in the Database Node:

# dbmcli -e list alerthistory

4. Re-enable and restart the Database services:

    If running Linux or Solaris native - follow Steps 11 to 14 of MOS Note:
       How to shutdown the Exadata database nodes and storage cells in a rolling fashion so certain hardware tasks can be performed. (Doc ID 1539451.1)

    If running OVM then follow MOS Note:
       How to Shutdown and Startup Exadata compute nodes running OVM (Doc ID 2367609.1)

 

PARTS NOTE:

7322171 [F] Left Front Indicator Module
7344566 [F] Cable Kit
   - 7329640 11-Pin Front Interface Module Cable, 635mm

 

REFERENCE INFORMATION:

Oracle Exadata Database Machine Maintenance Guide: https://docs.oracle.com/cd/E80920_01/DBMMN/maintaining-exadata-database-servers.htm#DBMMN22020

Oracle Server X7-2 Documentation https://docs.oracle.com/cd/E72435_01/index.html

How to shutdown the Exadata database nodes and storage cells in a rolling fashion so certain hardware tasks can be performed. (Doc ID 1539451.1)

How to Shutdown and Startup Exadata compute nodes running OVM (Doc ID 2367609.1)

 


Attachments
This solution has no attachment
  Copyright © 2018 Oracle, Inc.  All rights reserved.
 Feedback