Asset ID: |
1-71-2320324.1 |
Update Date: | 2017-11-21 |
Keywords: | |
Solution Type
Technical Instruction Sure
Solution
2320324.1
:
SL4000 - How to Replace the Fan Assembly (LOF)
Related Items |
- StorageTek SL4000 Modular Library System
|
Related Categories |
- PLA-Support>Sun Systems>TAPE>Tape Hardware>SN-TP: SL4000 Library
|
In this Document
Oracle Confidential PARTNER - Available to partners (SUN).
Reason: Confidential for service personnel
Applies to:
StorageTek SL4000 Modular Library System - Version All Versions and later
Information in this document applies to any platform.
Goal
Fan Assembly (LOF) Replacement
Solution
DISPATCH INSTRUCTIONS
- WHAT SKILLS DOES THE FIELD ENGINEER/ADMINISTRATOR NEED?: Familiar with the SL4000 Library.
- TIME ESTIMATE: 20 minutes
- TASK COMPLEXITY: 1
FIELD ENGINEER/ADMINISTRATOR INSTRUCTIONS:
- PROBLEM OVERVIEW: The LOF Fan Assembly has been determined defective and requires replacement
- WHAT STATE SHOULD THE SYSTEM BE IN TO BE READY TO PERFORM THE RESOLUTION ACTIVITY?: This part can be hot swapped.
- WHAT ACTION DOES THE FIELD ENGINEER/ADMINISTRATOR NEED TO TAKE?:
Note: Refer to the SL4000 Install and Service Manual for additional details as needed.
Fan Assembly (LOF) Replacement
Removal
You can hot-swap the fan assembly as long as the secondary fan assembly is fully operational.
1. Verify the fan assembly is offline. In the GUI, go to Hardware. In the Device Status Tree, locate the Fan Assembly in the base module and verify the Control State is "Offline". If it is online, right click the fan assembly, go to Control State, and then click Go Offline.
2. Physically locate the fan assembly (see "Base Card Cage Component Locations" on page 4-11).
3. Unlock the release tabs. Remove the assembly (for details see "Removing a Quick Release Component" on page 4-9).
Replacement
1. Slide the new fan assembly into place and lock the release levers (for details see "Installing a Quick Release Component" on page 4-10).
2. Verify that the fans are working and that the fault LED is OFF.
OBTAIN CUSTOMER ACCEPTANCE
- WHAT ACTION DOES THE FIELD ENGINEER/ADMINISTRATOR NEED TO TAKE TO RETURN THE SYSTEM TO AN OPERATIONAL STATE?: Verify the LOF Fan Assembly is functional to the library.
PARTS NOTE: Components List https://mosemp.us.oracle.com/handbook_internal/Systems/SL4000/components.html
REFERENCE INFORMATION: SL4000 Install and Service Manual: http://amomv0115.us.oracle.com/archive/cd_ns/E88746_01/index.html
Attachments
This solution has no attachment