Sun Microsystems, Inc.  Oracle System Handbook - ISO 7.0 May 2018 Internal/Partner Edition
   Home | Current Systems | Former STK Products | EOL Systems | Components | General Info | Search | Feedback

Asset ID: 1-71-2320226.1
Update Date:2017-11-21
Keywords:

Solution Type  Technical Instruction Sure

Solution  2320226.1 :   SL4000 - How to Replace the DC Power Converter (LOY) Replacement  


Related Items
  • StorageTek SL4000 Modular Library System
  •  
Related Categories
  • PLA-Support>Sun Systems>TAPE>Tape Hardware>SN-TP: SL4000 Library
  •  




In this Document
Goal
Solution


Oracle Confidential PARTNER - Available to partners (SUN).
Reason: Confidential for service personnel

Applies to:

StorageTek SL4000 Modular Library System - Version All Versions and later
Information in this document applies to any platform.

Goal

How to Replace the DC Power Converter (LOY) Replacement.

Solution

DISPATCH INSTRUCTIONS
- WHAT SKILLS DOES THE FIELD ENGINEER/ADMINISTRATOR NEED?: Familiar with the SL4000 Library.
- TIME ESTIMATE: 20 minutes
- TASK COMPLEXITY: 1

FIELD ENGINEER/ADMINISTRATOR INSTRUCTIONS:
- PROBLEM OVERVIEW: The DC power converter has been determined defective and requires replacement
- WHAT STATE SHOULD THE SYSTEM BE IN TO BE READY TO PERFORM THE RESOLUTION ACTIVITY?: This part can be hot swapped.
- WHAT ACTION DOES THE FIELD ENGINEER/ADMINISTRATOR NEED TO TAKE?:

Note: Refer to the SL4000 Install and Service Manual for additional details as needed.

DC Power Converter (LOY) Replacement
Required Tools
■ ESD protection

Removal
You can hot-swap a DC power converter (LOY) only if the secondary converter is operational.
1. Verify the DC converter is offline. In the GUI, go to Hardware . In the Device Status Tree, locate the DC Converter in the base module and verify the Control State is "Offline". If it is online, right click the DC Converter, go to Control State , and then click Go Offline.
2. Locate the DC converter (see "Base Card Cage Component Locations" on page 4-11).
3. Pinch and pull the release levers. Remove the card (see "Removing a Quick Release Component" on page 4-9).

Replacement
1. Slide the new card into place and lock the release levers (see "Installing a Quick Release Component" on page 4-10).

OBTAIN CUSTOMER ACCEPTANCE
- WHAT ACTION DOES THE FIELD ENGINEER/ADMINISTRATOR NEED TO TAKE TO RETURN THE SYSTEM TO AN OPERATIONAL STATE?: Verify the DC power converter is functional to the library.

PARTS NOTE: Components List https://mosemp.us.oracle.com/handbook_internal/Systems/SL4000/components.html

REFERENCE INFORMATION: SL4000 Install and Service Manual http: http://amomv0115.us.oracle.com/archive/cd_ns/E88746_01/index.html


Attachments
This solution has no attachment
  Copyright © 2018 Oracle, Inc.  All rights reserved.
 Feedback