Sun Microsystems, Inc.  Oracle System Handbook - ISO 7.0 May 2018 Internal/Partner Edition
   Home | Current Systems | Former STK Products | EOL Systems | Components | General Info | Search | Feedback

Asset ID: 1-71-2308658.1
Update Date:2017-09-19
Keywords:

Solution Type  Technical Instruction Sure

Solution  2308658.1 :   SL4000 - 1200W DC Power Supply Replacement  


Related Items
  • StorageTek SL4000 Modular Library System
  •  
Related Categories
  • PLA-Support>Sun Systems>TAPE>Tape Hardware>SN-TP: SL4000 Library
  •  




In this Document
Goal
Solution


Oracle Confidential PARTNER - Available to partners (SUN).
Reason: Confidential for service personnel

Applies to:

StorageTek SL4000 Modular Library System - Version All Versions and later
Information in this document applies to any platform.

Goal

 How to replace the 1200W DC Power Supply in the SL4000 library.

Solution

 DISPATCH INSTRUCTIONS
- WHAT SKILLS DOES THE FIELD ENGINEER/ADMINISTRATOR NEED?: Familiar with the SL4000 and LTO Tape Drive.
- TIME ESTIMATE: 10 minutes
- TASK COMPLEXITY: 1

FIELD ENGINEER/ADMINISTRATOR INSTRUCTIONS:
- PROBLEM OVERVIEW: 1200W DC power supply has been determined defective and requires replacement
- WHAT STATE SHOULD THE SYSTEM BE IN TO BE READY TO PERFORM THE RESOLUTION ACTIVITY?: This part can be hot swapped.
- WHAT ACTION DOES THE FIELD ENGINEER/ADMINISTRATOR NEED TO TAKE?:

Note: Refer to the SL4000 Install and Service Manual for additional details as needed.

1200W DC Power Supply Replacement
The 1200W DC power supplies are used for drive and robotics power. These can be hot swapped as long as there are enough other power supplies to provide sufficient power. The library does not perform any management of tape drives based on installed power supplies. The actual load depends on the drives installed and their activity.

Removal
1.  Push Retention tab and pull latch.

2. Side out power supply with pull latch in open position

Replacement

1. Slide in power supply with latch in open position.

2. Push latch to lock.

OBTAIN CUSTOMER ACCEPTANCE
- WHAT ACTION DOES THE FIELD ENGINEER/ADMINISTRATOR NEED TO TAKE TO RETURN THE SYSTEM TO AN OPERATIONAL STATE?: Verify the power supply is functional to the library.

PARTS NOTE: Components List https://mosemp.us.oracle.com/handbook_internal/Systems/SL4000/components.html

REFERENCE INFORMATION: SL4000 Install and Service Manual http://amomv0115.us.oracle.com/archive/cd_ns/E88746_01/index.html


Attachments
This solution has no attachment
  Copyright © 2018 Oracle, Inc.  All rights reserved.
 Feedback