How to Replace a SPARC T8-2 PCIe Card
Solution
**************************************************************************************
To report errors or request improvements on this procedure, please add a comment on Doc ID: 2291698.1
**************************************************************************************
ESD Caution:
- Circuit boards and drives contain electronic components that are extremely sensitive to static electricity. Ordinary amounts of static electricity from clothing or the work environment can destroy the components located on these boards. Do not touch the components along their connector edges.
- Use a Antistatic Wrist strap. Attach one end of the strap to your wrist and the other end to the chassis, depending on what type of strap you use, with the adhesive end or the metal plug.
- Use an Antistatic Mat. Place ESD-sensitive components such as motherboards, memory, and other PCBs on an antistatic mat.
Contamination Caution:
- Dust particles of packaging material are number one cause of datacenter contamination. Make sure to remove all packaging material, up to the ESD safe packaging material, while still being outside the datacenter.
DISPATCH INSTRUCTIONS
WHAT SKILLS ARE REQUIRED?: No special skills required, Customer Replaceable Unit (CRU) procedure
Time Estimate: 30 minutes
Task Complexity: 0
REMOVAL/REPLACEMENT INSTRUCTIONS:
PROBLEM OVERVIEW: SPARC T8-2 PCIe Card Replacement
WHAT STATE SHOULD THE SYSTEM BE IN TO BE READY TO PERFORM THE RESOLUTION ACTIVITY? :
Note:
- If the system is still up and functioning, the Customer should perform an orderly and graceful shutdown of the applications and operating system.
- Then power off the server and remove the AC power cords from the system. For ALL scenarios where an AC power down or AC power cycle is required for a T8-x server, please always use the steps in doc 1571054.1 prior to physically removing AC power cables from the server.
WHAT ACTIONS ARE REQUIRED?:
Damage Alert:
- Perform a visual inspection of the replacement part to make sure that there are no damaged components, connectors, bent pins, damaged packages during shipping, etc. If the part is damaged, don't install it into the system, order a new part. Handle with caution and package carefully the return part to avoid any damages during shipping.
Replace the PCIe Card
1. Prepare the server for service.
a. Power off the server and disconnect the power cords from the power supplies.
b. Extend the server to the maintenance position in the rack.
c. Attach an anti-static wrist strap.
2. Remove the Top Cover of system
3. Locate the PCIe card or filler that you want to remove.
Note:
- Note the slot location for each PCIe card you plan to remove.
4. Unplug all data cables from the PCIe card.
Note:
- Note the location of all cables for reinstallation later.
5. Remove any transceivers from the PCIe card before removing the card.
6. Disengage the PCIe card slot crossbar from its locked position by pulling it toward the interior of the chassis.
7. Rotate the crossbar to an upright position.
8. Carefully remove the PCIe card or filler from the card slot.
9. Replace with another PCIe card or filler and re-engage the PCIe slot crossbar to it's locked position before the server is connected to power again.
10. Install the top cover on the system
11. Return the Server to operation.
a. Remove any anti-static measures that were used.
b. Return the server to it's normal operating position within the rack.
c. Re-install the AC power cords and any data cables that were removed.
d. Power on server. Verify that the Power/OK indicator led lights steady on.
OBTAIN CUSTOMER ACCEPTANCE
WHAT ACTIONS ARE REQUIRED TO RETURN THE SYSTEM TO AN OPERATIONAL STATE?:
Boot system and monitor boot sequence for errors. Test functionality of system:
- Run the Solaris "fmadm faulty" and SP/ILOM "show faulty" command to verify that the fault has been cleared.
- Perform one of the following tasks based on your verification results:
- If the previous steps did not clear the fault, refer to doc 1004229.1 for information about the tools and methods you can use to diagnose and clear component faults.
- If the previous steps indicate that no faults have been detected, the component has been replaced successfully. No further action is required
- Restart software applications per applicable administration guides to resume system operation.
PARTS NOTE:
https://support.oracle.com/handbook_private/Systems/SPARC_T8_2/components.html#Ethernet
REFERENCE INFORMATION:
SPARC T8-2 Service Manual: https://docs.oracle.com/cd/E79179_01/html/E80511/index.html
References
<NOTE:1571054.1> - Performing an AC power cycle on the T3/T4/T5/S7/T7/T8 Servers
Attachments