![]() | Oracle System Handbook - ISO 7.0 May 2018 Internal/Partner Edition | ||
|
|
![]() |
||||||||||||
Solution Type Technical Instruction Sure Solution 2291183.1 : How to Replace a Sparc T8-2 Power Supply [VCAP]
Applies to:SPARC T8-2 - Version All Versions and laterInformation in this document applies to any platform. GoalHow to Replace a Sparc T8-2 Power Supply Solution
*************************************************************************************** ESD Caution:
Contamination Caution:
DISPATCH INSTRUCTIONS WHAT SKILLS ARE REQUIRED?: No special skills required, Customer Replaceable Unit (CRU) procedure
Time Estimate: 30 minutes Task Complexity: 0 REMOVAL/REPLACEMENT INSTRUCTIONS: PROBLEM OVERVIEW: SPARC T8-2 Power Supply Replacement WHAT STATE SHOULD THE SYSTEM BE IN TO BE READY TO PERFORM THE RESOLUTION ACTIVITY? : Note:
WHAT ACTIONS ARE REQUIRED?: Damage Alert:
Locate a Faulty Power Supply View the following LEDs, which are lit when a power supply fault is detected:
A) Rear Power Supply Fault LED on the front bezel of the server:
Legend LED Symbol Color Lights When...
1 Service Action Required Amber The power supply is faulty. Service action is required.
2 OK Green Both DC outputs (3.3V standby and 12V main) are active and within regulation. 3 AC Present Green This LED turns on when AC voltage is applied to the power supply. B) Service Action Required LED on the faulted power supply. Note:
Remove a Power Supply
Caution:
1. Prepare for servicing.
a. Attach an antistatic wrist strap. b. If necessary, release the cable management arm to access the power supplies. 2. Disconnect the power cord from the power supply that displays an amber lit Service Action Required LED.
3. Press down on the release latch to open the ejector arm.
4. Slide the power supply out of the chassis.
Caution:
Install a Power Supply Caution:
1. If necessary, release the cable management arm to access the power supplies (Do not allow the CMA to hang unsupported while it is unattached). 2. Align the power supply with the empty power supply chassis bay.
3. Slide the power supply into the bay until it is fully seated.
4. Move the release latch up to secure the power supply in place.
5. Reconnect the power cord to the power supply.
6. Verify that the AC OK LED is lit.
7. Verify that the following LEDs are not lit:
a. Service Action Required LED on the power supply
b. Front and rear Service Action Required LEDs
c. Rear PS Failure LED on the bezel of the server
OBTAIN CUSTOMER ACCEPTANCE WHAT ACTIONS ARE REQUIRED TO RETURN THE SYSTEM TO AN OPERATIONAL STATE?: Verify Power Supply Functionality 1. Verify that the amber Service Required LED on the replaced power supply is not lit. 2. Verify that the PS Fault LED on the front of the server is not lit. 3. Use the Oracle ILOM "show faulty" command to verify that the fault has been cleared. 4. Perform one of the following tasks based on your verification results:
a. If the previous steps indicate that no faults have been detected, then the component has been replaced successfully. No further action is required.
REFERENCE INFORMATION: Attachments This solution has no attachment |
||||||||||||
|