Sun Microsystems, Inc.  Oracle System Handbook - ISO 7.0 May 2018 Internal/Partner Edition
   Home | Current Systems | Former STK Products | EOL Systems | Components | General Info | Search | Feedback

Asset ID: 1-71-2290658.1
Update Date:2018-03-19
Keywords:

Solution Type  Technical Instruction Sure

Solution  2290658.1 :   How to Replace a SPARC T8-1 Clear Plastic Air Duct Assembly [VCAP]  


Related Items
  • SPARC T8-1
  •  
Related Categories
  • PLA-Support>Sun Systems>Sun_Other>Sun Collections>SN-OTH: SPARC-CAP VCAP
  •  




In this Document
Goal
Solution
References


Applies to:

SPARC T8-1 - Version All Versions to All Versions [Release All Releases]
Information in this document applies to any platform.

Goal

How to Replace a SPARC T8-1 Clear Plastic Air Duct Assembly

Solution

 

*******************************************************************************
To report errors or request improvements on this procedure, please add a comment on Doc ID: 2290658.1
*******************************************************************************

ESD Caution:

  • Circuit boards and drives contain electronic components that are  extremely sensitive to static electricity. Ordinary amounts of static electricity from clothing or the work environment can destroy the components located on these boards. Do not touch the components along their connector edges.
  • Use a Antistatic Wrist strap. Attach one end of the strap to your wrist and the other end to the chassis, depending on what type of strap you use, with the adhesive end or the metal plug.
  • Use an Antistatic Mat. Place ESD-sensitive components such as motherboards, memory, and other PCBs on an antistatic mat.

Contamination Caution:

  • Dust particles of packaging material are number one cause of datacenter contamination. Make sure to remove all packaging material, up to the ESD safe packaging material, while still being outside the datacenter.

 

DISPATCH INSTRUCTIONS

WHAT SKILLS ARE REQUIRED?: No special skills required, Customer Replaceable Unit (CRU) procedure

Time Estimate: 30 minutes

TASK COMPLEXITY: 0

REMOVAL/REPLACEMENT INSTRUCTIONS:

PROBLEM OVERVIEW: SPARC T8-1 Clear Plastic Air Duct Assembly Replacement


WHAT STATE SHOULD THE SYSTEM BE IN TO BE READY TO PERFORM THE RESOLUTION ACTIVITY?:

Note:
  • If the system is still up and functioning, the Customer should perform an orderly and graceful shutdown of the applications and operating system.
  • Then power off the server and remove the AC power cords from the system. For ALL scenarios where an AC power down or AC power cycle is required for a T8-x server, please always use the steps in doc 1571054.1 prior to physically removing AC power cables from the server.

 
WHAT ACTIONS ARE REQUIRED?:

Damage Alert:
  • Perform a visual inspection of the replacement part to make sure that there are no damaged components, connectors, bent pins, damaged packages during shipping, etc). If the part is damaged, don't install it into the system, order a new part. Handle with caution and package carefully the return part to avoid any damages during shipping.


Replace the Clear Plastic Air Duct Assembly

1. Prepare the server for service.

    a. Power off the server and disconnect the power cords from the power supplies.
    b. Extend the server to the maintenance position in the rack.
    c. Attach an anti-static wrist strap. Power off server

2. Remove the Top Cover of system

3. Open the clear plastic air duct assembly cover by lifting the edge of the cover closest to the rear of the server. Perform the next steps to remove the clear plastic air duct assembly:

    a. Open the fan cover.
    b. Pull open the plastic tabs to release the clear plastic air duct assembly covers hinged edge and remove it from the server.

4. Install the new clear plastic air duct assembly cover by performing the next steps:

    a. Open the fan cover.
    b. Align the clear plastic air duct assembly cover on its hinge edge.
    c. Attach the hinged plastic tabs to the server by pulling them open and letting them seat into the holes so that the clear plastic air duct assembly cover can hinge up and down.
    d. Lower the clear plastic air duct assembly cover (making sure the two pairs of side tabs clear the sides of the server).

5. Install the Top Cover of system

6. Return the Server to operation.

    a. Remove any anti-static measures that were used.
    b. Return the server to it's normal operating position within the rack.
    c. Re-install the AC power cords and any data cables that were removed.
    d. Power on server. Verify that the Power/OK indicator led lights steady on.

OBTAIN CUSTOMER ACCEPTANCE

WHAT ACTIONS ARE REQUIRED TO RETURN THE SYSTEM TO AN OPERATIONAL STATE?:

Boot system and monitor boot sequence for errors. Test functionality of system:

  1. Run the Solaris "fmadm faulty" and SP/ILOM "show faulty" command to verify that the fault has been cleared.
  2. Perform one of the following tasks based on your verification results:
    • If the previous steps did not clear the fault, refer to doc 1004229.1 for information about the tools and methods you can use to diagnose and clear component faults.
    • If the previous steps indicate that no faults have been detected, the component has been replaced successfully. No further action is required
  3. Restart software applications per applicable administration guides to resume system operation.

PARTS NOTE:
https://support.oracle.com/handbook_private/Systems/SPARC_T8_1/components.html#Fan

REFERENCE INFORMATION: 
SPARC T8-1 Service Manual: https://docs.oracle.com/cd/E79179_01/html/E80510/index.html

 

References

<NOTE:1571054.1> - Performing an AC power cycle on the T3/T4/T5/S7/T7/T8 Servers

Attachments
This solution has no attachment
  Copyright © 2018 Oracle, Inc.  All rights reserved.
 Feedback