![]() | Oracle System Handbook - ISO 7.0 May 2018 Internal/Partner Edition | ||
|
|
![]() |
||||||||||||||||
Solution Type Technical Instruction Sure Solution 2232391.1 : SL3000 - Broken Rail On Which Robotic Arm Wheels Run On
In this Document
Oracle Confidential PARTNER - Available to partners (SUN). Applies to:Sun StorageTek SL3000 Modular Library System - Version All Versions and laterInformation in this document applies to any platform. GoalBroken rail on which robotic arm wheels run on. SolutionIt is hard to tell exactly what the extent of the damage is from just these photos. It looks like the copper power strip has been pushed out and bent. The rail terminator seems to have fallen off as a result of whatever caused this. No idea how a power strip can get bent like this as this is by the side access, it may have accidentally been hit on the end of the rail. FE needs to power off the library and check that the rail power strip is fully connected. As the end of the rail on the right seems to be bent, the FE will likely need to replace this power strip. The rail terminator also looks like it may be damaged, so this should be replaced also. Part numbers to order: References<NOTE:1547088.2> - How to Upload Files to Oracle Support<NOTE:1307534.1> - SL3000/SL8500 - How to Collect Log Snapshot From SL8500 or SL3000 Library Attachments This solution has no attachment |
||||||||||||||||
|