![]() | Oracle System Handbook - ISO 7.0 May 2018 Internal/Partner Edition | ||
|
|
![]() |
||||||||||||||
Solution Type Technical Instruction Sure Solution 2193353.1 : SL3000 - How to Remove and Replace the PUA2 SCSI/FC Host Connection Card
In this Document
Oracle Confidential PARTNER - Available to partners (SUN). Applies to:Sun StorageTek SL3000 Modular Library System - Version All Versions and laterInformation in this document applies to any platform. Dual Fibre Port PUA2 Card: The original logic card that supplied a Fibre Channel interface for the SL3000 was the MPU2 card. An updated Fibre Channel interface card is supported at 3.0 and will start shipping with new builds 7/2011 for single port operations by default. - Dual Port FC operations must be hardware activated by a hardware activation key. - The original gen_1 PUA card has an obsolete Qlogic 2312 chip. The PUA2 has an updated Qlogic 2532 chip. PUA2 CB_ 003-5479-02 - Part Number 418660302. - Marketing Part Number XSL3000K-2FCCARD & SL3000-2FCCARD-Z. - The PUA2 card supports two 1G/2G/4G/8G Fibre Channel interfaces. - The default operation is single port (Port 1 active); a connection to Port 2 in this configuration will result in a unit check/attention condition. - The minimum code version required to activate dual port operation is 3.00. - Once both ports are activated, Ports 1 and 2 can be connected to the same host or connected to two different hosts. - The ports operate concurrently and each port always responds on the same input port. - In case of a failure on one port, switching to the other port is accomplished by host software; there is no automatic failover. GoalHow to remove and replace a defective PUA2 card in a SL3000. SolutionDISPATCH INSTRUCTIONS WHAT SKILLS DOES THE ENGINEER NEED:(IS A SITE ENGINEER AVAILABLE?) TASK COMPLEXITY: 2 TIME ESTIMATE: 120 minutes PROBLEM OVERVIEW: Host connectivity has been lost CONFIRM THE FAULT BY CHECKING: Check for light on the PUA2 cable coming out of the SFP WHAT STATE SHOULD THE SYSTEM BE IN TO BE READY TO PERFORM THE RESOLUTION ACTIVITY? : The library needs to be offline with either ACSLS or HSC. The paths from the host to the library need to be offline WHAT ACTION DOES THE ENGINEER NEED TO TAKE: Removal Procedure: - All circuit cards within the electronics module assembly are ESD sensitive.. Follow proper ESD procedures. Installation Procedure: - Remove the replacement card from the EDS-protective wrapper - Replace the ECM cover if present. Attachments This solution has no attachment |
||||||||||||||
|