Solution  2146113.1 :   CommsGBU Network Support Signaling Solutions PIC Handoff Procedure  


Related Items
  • Oracle Communications Performance Intelligence Center (PIC) Hardware
  •  
  • Oracle Communications Performance Intelligence Center (PIC) Software
  •  
Related Categories
  • PLA-Support>Sun Systems>CommsGBU>Global Signaling Solutions>SN-SND: Tekelec PIC
  •  




In this Document
Goal
Solution
 Document Description
 Work instruction Flow
 Welcome tab
 Overview tab
 Health check tab
 Engineering Document and Patch Checks Tab
 Correlation rates tab
 DFP Input
 NSP Backup Tab
 PIC Inventory Tab
 SR in Progress Tab
References


Applies to:

Oracle Communications Performance Intelligence Center (PIC) Hardware - Version 4.1 and later
Oracle Communications Performance Intelligence Center (PIC) Software - Version 4.1 and later
Information in this document applies to any platform.

Goal

The goal is to provide the Oracle Support and Consulting Teams, as well as the Oracle Partners, with the necessary documentation and instructions to start and complete successfully the Project Handoff to Support procedure for the Tekelec PIC Product.

Solution

Document Description

The Handover Report is an excel file which should be created and named following the rules below:

 Handover – Customer name – SO number – beginning date of the Handover

The document contains the 7 tabs below :

  1. Welcome
  2. Overview
  3. Health Check
  4. Engineering Document
  5. Correlation Rates
  6. DFP Input
  7. NSP Backup
  8. CSR in progress

The Support Engineer should follow the color codes below when completing the report:

Color Codes for validation

Green - Validated
Orange- Not Blocking issue or issue not related to the project
Red - Not Validated, impacting

Work instruction Flow

This section describes how to complete the 7 tabs.

Welcome tab

The Welcome Tab contains the information below :

  1. Customer Name
  2. SO number ( Sales Order number )
  3. System Identifer ( SI XXXXXXXX )
  4. Consulting Engineer name.
  5. Support Engineer name.
  6. Oracle Project Manager contact information.
  7. Customer Project Manager Contact Information.
  8. Project Scope.

Overview tab

This Tab contains 2 parts:

  • Data:
    • HealthCheck
    • Engineering Document
    • Correlation Rates
    • NSP Backup
  • Embedded documents:
    • Engineering Document
    • NSP Configuration Report from CCM
    • Health Check
    • NSP backup ( location on the Oracle network )

Health check tab

The servers concerned by the Handover are listed on this Tab.

After running the Health Check script, all the errors must be listed.

Please refer to table below for validation :

Color Codes for validation

Green - No errors on the system
Orange - Not Blocking Errors or Errors not related to the project ( Errors preceded by the word : Minor )
Red - Impacting and Blocking Errors ( Errors preceded by the word : Major or ERROR )

Engineering Document and Patch Checks Tab

  • The Support Engineer has to check if the information below are present on the Engineering Document, and list all incorrect information:

Items

Customers Contact (Name, email, fix/mobile phone, address)
Responsible by site
Project Manager on the customer side
Address of delivery  and address of sites
Remote connection
Connexion procedure
password of connections
Test of connection
Procedure to Access on site
Hardware identification (Delivered by Tekelec)
Constructor Serial number by server
Product number (exist in the same etiquette than the serial number in front of server)
Serial number of CxC, Lantronix
Server configuration
Raid configuration
Disk capacity
LAN connectivity (speed card LAN, full duplex, half duplex,..)
IP addresses of servers
LAN diagram
Type of servers (DS, NSP, IXP, IMF,..)
Users/Password administrator of the servers + PCAnywhere, VNC,...
Global view of system architecture (Schema presenting all servers with their disposition) one schema by type of system except some cases
Global view of connection between cross connect
List of the sessions by PMF & IXP
List of Software installed and delivered to customer
Specific parameter (in case of modification of default setting, add a column ‘specific parameter’ to be checked in case of presence of modification, add a column commentaries ) + backup of configuration
diagram of bays, KVM, switch, cxc and lantornix (Cabinet Layout)
Emplacement of  bays on different sites
Document of engineering version, n° of projects with date of finalisation
Licences
ILO access (Yes or no) + IP adress
Software availability in case of reinstallation (version, path,...)
  • Check patches as below :
    •  latest patches are installed on the system
    •  All equipment are on the same level of patches/release
There is a separate Knowledge document created for every release which includes all currently available patches for a particular release. These documents can be found in PIC Info Center (Doc ID 1989320.2), Tab “Patch and Maintenance”.

Please refer to table below for validation :

Color Codes for validation
Green -The information is correct
Orange - The information is incorrect but related not to the project
Red - The information is incorrect and related to the project

Correlation rates tab

The Support Engineer has to check the availability of Monica sessions and Correlation Rates by providing the graphs. Next step is to confirm that the correlation rates are above the agreed level and accepted by customer.

Since PIC 10.1 correlation rate can be checked in the capacity management cession as well as the volume of data from DFPs but also from xMF
Capacity Management Best Practices (Doc ID 1683859.2)

Please refer to table below for validation :

Color Codes for validation

Green - If the Monica rates are between 100% and 99%
Orange - If the Monica rates are between 99% and 95%
Red - If the Monica rates are under 95%

DFP Input

The Support Engineer has to list the Build DFP per IXP and the corresponding Input graph for 1 week,

It is required to calculate Build Input traffic in “Mbps” to know the Builder load per protocol. Please follow the instructions below for the DFP Build graphs :

  1. Extraction :
    • From ProTrace application, retrieve the data contained in Build Monitor session (ixpXXXXbuildmonitor) for a period of at least 5 days (preferably from last Thursday 00:00:00 to Monday 23:59:59) for all the IXP subsystem.
    • Download format should be in “.CSV” not in “Direct Excel”. It’s preferred to follow naming convention for automation steps: “IxpXXXX_Build_Monitor” whereas XXXX – subsystem number.
  2. Processing
    • Build Input is obtained by  filtering on the “Initial” and retrieving the “BldReceivedBytes” values for the particular Build Dataflow processing(DFP) running on that particular IXP.
    • All these values are available in Bytes which are pre-processed during one minute.
    • It is converted into “Mbps” by the following formula:
      • X*8/(60*1000000) whereas “X” is Build data in bytes.
      • “Initial” values corresponds to the Input traffic coming on each Build DFP, whereas “Final” corresponds to the Output traffic generated from each Build DFP according to the xDR builder applied.
      • For each DFP, separate sheets must be created for Build Input data and Build input graph requires to be created based on the data formatted.

NSP Backup Tab

The Support Engineer has to Check the information below :

  • Crontab on the NSP server
  • ExpNSP.dmp file
  • Exportrealm file

Please refer to table below for validation :

Color Codes for validation

Green - f the backup is running
Red - If the backup is not running

PIC Inventory Tab

The Support Engineer has to insert the PIC Inventory report provided by PS adding comments if required.

picInventory: Installation and Usage (Doc ID 2047371.1)

SR in Progress Tab

All the SR should be listed with the information below :

  • Issue description
  • Solution Description
  • Bug/SR number
  • Status

References

<NOTE:2141679.1> - (CommsGBU Network Support) Signaling Solutions Project Handoff Guidelines