Asset ID: |
1-71-2108636.1 |
Update Date: | 2016-08-29 |
Keywords: | |
Solution Type
Technical Instruction Sure
Solution
2108636.1
:
PCRF Pooling Migration Estimated Time Is Very Long
Related Items |
- Oracle Communications Diameter Signaling Router (DSR)
|
Related Categories |
- PLA-Support>Sun Systems>CommsGBU>Global Signaling Solutions>SN-SND: Tekelec DSR
|
In this Document
Created from <SR 3-12211575431>
Applies to:
Oracle Communications Diameter Signaling Router (DSR) - Version DSR 6.0 and later
Information in this document applies to any platform.
Goal
In lab, there are only 9 un-migrated bindings records; however, the estimation is 01 days 06 hours 23 minutes 31 seconds.
Is there anyway to speed this up?
Solution
No, there is no way to speed this up. PCRF Pooling is turned on, nothing happens immediately.
All existing binding will stay with the existing binding repository as long as there is activity on that binding.
Old binding stay right where they are until the binding is released. Only NEW bindings will be established on the new Pooling PCRF.
So there is no way to speed up the movement of bind to the new Pooling PCRF.
Attachments
This solution has no attachment