![]() | Oracle System Handbook - ISO 7.0 May 2018 Internal/Partner Edition | ||
|
|
![]() |
|||||||||||||||||||||||||||||||||||||
Solution Type Technical Instruction Sure Solution 2081006.1 : How to Replace an Oracle Server X5-2L, X6-2L Internal SAS Cable
In this Document
Oracle Confidential PARTNER - Available to partners (SUN). Applies to:Oracle Server X5-2L - Version All Versions and laterOracle Server X6-2L - Version All Versions and later Information in this document applies to any platform. Goal How to Replace an Oracle Server X5-2L, X6-2L Internal SAS Cable. SolutionDISPATCH INSTRUCTIONS WHAT SKILLS DOES THE FIELD ENGINEER/ADMINISTRATOR NEED?: TIME ESTIMATE: 60 minutes TASK COMPLEXITY: 1 FIELD ENGINEER/ADMINISTRATOR INSTRUCTIONS: PROBLEM OVERVIEW: An Oracle Server X5-2L, X6-2L Internal SAS Cable needs replacement WHAT STATE SHOULD THE SYSTEM BE IN TO BE READY TO PERFORM THE RESOLUTION ACTIVITY? : If the system is still up and functioning, customer should perform an orderly and graceful shutdown of applications and OS. Then power off the server and remove the AC power cords from the system. A data backup is not a prerequisite but is a wise precaution. WHAT ACTION DOES THE ENGINEER NEED TO TAKE:
Removing the SAS cable1. Power off the server and disconnect the power cords from the power supplies 2. Extend the server to the maintenance position 3. Attach an antistatic wrist strap to your wrist, and then to a metal area on the chassis 4. Remove the server top cover 5. Open the server fan assembly door and remove fan modules 6. Swivel the air baffle into the upright position to allow access to the SAS storage drive cables 7. Depending on your server's storage drive configuration, do one of the following:
8. To disconnect the SAS cables between the Oracle Storage 12 Gb/s SAS PCIe RAID HBA card in PCIe slot 6 and the front storage drive backplane, press each latch, and then pull out to disengage the cable from each SAS connector 9. Carefully remove the SAS cable bundles from the chassis mid-wall. Be careful not to snag the cables on the server components
Install the SAS cable1. Install the SAS cables between the front storage drive backplane and the Oracle Storage 12 Gb/s SAS PCIe RAID HBA card in PCIe slot 6 Route the SAS cable bundle through the chassis mid-wall and along the left side of the chassis. To ensure that the SAS cable bundle does not interfere with the air baffle, install the SAS cable bundle under the super capacitor cable for the Oracle Storage 12 Gb/s SAS PCIe RAID HBA card along the left side of the chassis
2. To reconnect the SAS cables between the front storage drive backplane and the Oracle Storage 12 Gb/s SAS PCIe RAID HBA card, plug each cable into its SAS connector until you hear an audible click Use the following table to ensure proper SAS cable connections:
3. Depending on your server's storage drive configuration, do one of the following:
4. Lower the air baffle to the installed position 5. Install the fan modules and close the fan assembly door 6. Install the server top cover 7. Return the server to the normal rack position 8. Reconnect the power cords to the power supplies, and power on the server
OBTAIN CUSTOMER ACCEPTANCE WHAT ACTION DOES THE CUSTOMER NEED TO TAKE TO RETURN THE SYSTEM TO AN OPERATIONAL STATE: Boot up system and verify full functionality REFERENCE INFORMATION: Oracle Server X5-2L Documentation: Oracle Server X6-2L Documentation: Attachments This solution has no attachment |
|||||||||||||||||||||||||||||||||||||
|