Sun Microsystems, Inc.  Oracle System Handbook - ISO 7.0 May 2018 Internal/Partner Edition
   Home | Current Systems | Former STK Products | EOL Systems | Components | General Info | Search | Feedback

Asset ID: 1-71-2053067.1
Update Date:2015-10-21
Keywords:

Solution Type  Technical Instruction Sure

Solution  2053067.1 :   How to Replace an NMS (Netra Modular System) DB9 LED Cable  


Related Items
  • Netra Modular System
  •  
Related Categories
  • PLA-Support>Sun Systems>Sun_Other>Sun Collections>SN-OTH: x64-CAP VCAP
  •  




In this Document
Goal
Solution


Oracle Confidential PARTNER - Available to partners (SUN).
Reason: CAP document

Applies to:

Netra Modular System - Version All Versions and later
Information in this document applies to any platform.

Goal

How to Replace an NMS (Netra Modular System) DB9 LED Cable

Solution

CAP PROBLEM OVERVIEW:

You can replace the DB9 LED cable with no impact to the operation of the modular system.

DISPATCH INSTRUCTIONS

WHAT SKILLS DOES THE ENGINEER NEED:
Netra Modular System Training

TIME ESTIMATE: 60 minutes

TASK COMPLEXITY: 2

FIELD ENGINEER INSTRUCTIONS

It is recommended before arriving on site to review the process in the service manual supplement as it contains graphic and additional information that is too large or too complex to fix into this text only CAP.
Reference:
  Replace the DB9 LED Cable
  http://docs.oracle.com/cd/E59318_01/html/E59323/z40002801912127.html#scrolltoc

Tools Needed:
#3 Phillips screwdriver - recommended magnetic with 6" minimum shaft.  A 12-16" works best on this system.

WHAT STATE SHOULD THE SYSTEM BE IN TO BE READY TO PERFORM THE RESOLUTION ACTIVITY? :

1. Follow safety and ESD precautions.

2. From the front of the modular system:
a. Remove the status LED panel located on the top front of the modular system.
b. Disconnect the existing cable from the LED panel.
c. Connect the new cable to the LED panel, then route the cable to the rear of the modular system and over the coupler panel at slot 41.

3. Install the LED panel.

4. At the rear of the modular system:
a. Remove the node rear support bracket from slot 20.
b. Starting from the top, remove the FBS covers a few at a time.

Note:  You may find that disconnecting the right side of the FBS covers should be enough to feed the cable down from the top.

c. Lay the new cable in the right-side channel.  For any cable slack, lay it on top of the top most switch.
d. If possible, remove the faulty cable completely.

Note:  To facilitate easy removal of the bad cable, cut the ends off.

e. Disconnect the DB-9 cable from the FMM.
f. Connect the new DB-9 cable to the FMM.

5. Install the node rear support bracket at slot 20.

 


Attachments
This solution has no attachment
  Copyright © 2018 Oracle, Inc.  All rights reserved.
 Feedback