Sun Microsystems, Inc.  Oracle System Handbook - ISO 7.0 May 2018 Internal/Partner Edition
   Home | Current Systems | Former STK Products | EOL Systems | Components | General Info | Search | Feedback

Asset ID: 1-71-2045811.1
Update Date:2018-05-14
Keywords:

Solution Type  Technical Instruction Sure

Solution  2045811.1 :   How to Replace an Oracle Server X5-2, X6-2 Internal SAS Cable  


Related Items
  • Oracle Server X6-2
  •  
  • Oracle Server X5-2
  •  
Related Categories
  • PLA-Support>Sun Systems>Sun_Other>Sun Collections>SN-OTH: x64-CAP VCAP
  •  




In this Document
Goal
Solution
 Removing the SAS cable
 Install the SAS cable


Oracle Confidential PARTNER - Available to partners (SUN).
Reason: SAS cable replacement is a FRU

Applies to:

Oracle Server X6-2 - Version All Versions to All Versions [Release All Releases]
Oracle Server X5-2 - Version All Versions to All Versions [Release All Releases]
Information in this document applies to any platform.

Goal

How to Replace an Oracle Server X5-2, X6-2 Internal SAS Cable.

Solution

DISPATCH INSTRUCTIONS

WHAT SKILLS DOES THE FIELD ENGINEER/ADMINISTRATOR NEED?:
Oracle Server X5-2, X6-2 Training

TIME ESTIMATE: 60 minutes 

TASK COMPLEXITY: 1 

FIELD ENGINEER/ADMINISTRATOR INSTRUCTIONS: 

PROBLEM OVERVIEW: An Oracle Server X5-2, X6-2 Internal SAS Cable needs replacement 

WHAT STATE SHOULD THE SYSTEM BE IN TO BE READY TO PERFORM THE RESOLUTION ACTIVITY? :

If the system is still up and functioning, customer should perform an orderly and graceful shutdown of applications and OS.  Then power off the server and remove the AC power cords from the system.

A data backup is not a prerequisite but is a wise precaution.

WHAT ACTION DOES THE ENGINEER NEED TO TAKE:

Removing the SAS cable

1. Power off the server and disconnect the power cords from the power supplies

2. Extend the server to the maintenance position

3. Attach an antistatic wrist strap to your wrist, and then to a metal area on the chassis

4. Remove the server top cover

5. Remove all of the server fan modules

6. To disconnect each SAS cable from the disk backplane, press the latch on the cable connectors and pull the connectors out

7. Disconnect the SAS cables and the super capacitor cable from the internal host bus adapter (HBA)

  1. Remove the PCIe riser from PCIe slot 3 and 4
  2. On the under side of the HBA card, press the SAS cable connector latches and then pull out the connectors
  3. On the under side of the HBA card, grasp the super capacitor connector and pull it out

9. Disconnect the super capacitor cable from the super capacitor

10. Carefully remove the SAS cables and the super capacitor cable from the server

 

Install the SAS cable

1. Carefully guide SAS cables and the super capacitor cable along the side of the chassis

2. Connect the super capacitor cable to the super capacitor

3. Connect the SAS cables the super capacitor cable to the internal HBA card

4. Install the SAS cables into the disk backplane

5. Install the PCIe riser with the internal HBA card into PCIe slot 3

6. Install all of the server fan modules

7. Install the server top cover

8. Close the server fan door

9. Return the server to the normal rack position

10. Reconnect the data cables to the server and reconnect the power cords to the server power supplies

11. Power on the server

 

OBTAIN CUSTOMER ACCEPTANCE

WHAT ACTION DOES THE CUSTOMER NEED TO TAKE TO RETURN THE SYSTEM TO AN OPERATIONAL STATE:

Boot up system and verify full functionality

REFERENCE INFORMATION:

Oracle Server X5-2 Documentation:
http://docs.oracle.com/cd/E41059_01/index.html

Oracle Server X6-2 Documentation:
http://docs.oracle.com/cd/E62159_01/index.html


Attachments
This solution has no attachment
  Copyright © 2018 Oracle, Inc.  All rights reserved.
 Feedback