Asset ID: |
1-71-2026199.1 |
Update Date: | 2018-05-15 |
Keywords: | |
Solution Type
Technical Instruction Sure
Solution
2026199.1
:
How to Replace an Oracle Server X5-4 Power Supply [VCAP]
Related Items |
- Oracle Server X5-4
- Exalytics In-Memory Machine X5-4
- Exalytics In-Memory Machine X6-4
|
Related Categories |
- PLA-Support>Sun Systems>Sun_Other>Sun Collections>SN-OTH: x64-CAP VCAP
- Microlearning>Video>ML-VID-VCAP
|
In this Document
Applies to:
Oracle Server X5-4 - Version All Versions to All Versions [Release All Releases]
Exalytics In-Memory Machine X5-4 - Version All Versions to All Versions [Release All Releases]
Exalytics In-Memory Machine X6-4 - Version All Versions to All Versions [Release All Releases]
Information in this document applies to any platform.
Goal
How to Replace an Oracle Server X5-4 Power Supply.
Solution
DISPATCH INSTRUCTIONS
WHAT SKILLS DOES THE FIELD ENGINEER/ADMINISTRATOR NEED:
No special skills required, Customer Replaceable Unit (CRU) procedure
TIME ESTIMATE: 30 minutes
TASK COMPLEXITY: 0
FIELD ENGINEER/ADMINISTRATOR INSTRUCTIONS:
PROBLEM OVERVIEW: An Oracle Server X5-4 Power Supply needs replacement
WHAT STATE SHOULD THE SYSTEM BE IN TO BE READY TO PERFORM THE RESOLUTION ACTIVITY? :
The server's redundant power supplies support concurrent maintenance, which enables you to remove and replace a power supply without shutting down the server, provided that the other power supply is online and working.
WHAT ACTIONS ARE REQUIRED?:
1.Confirm the Power Supply failure and it's location.
a. Confirm which Power Supply is to be replaced. When looking at the server from the rear PS0 is to the left and PS1 is to the right.
b. If the specific power supply to be replaced is not yet known check the status LEDs to identify the failed Power Supply. A failed PSU should have it's amber "service required" LED lit. A working PSU will only have it's green "AC OK" LED lit.
c. If the service is to be performed while the system is up and running confirm that the second PSU is online and working properly.
d. If a replacement Power Supply is not yet available leave the failed supply in place to provide proper airflow within the system until the replacement is available. You may notice that the failed Power Supply's fans are still turning. This is ok and the power supply may be removed while the fans are still spinning.
2. Remove the Power Supply
a. Gain access to the rear of the server where the faulty power supply is located.
b. Release the cable management arm (CMA).If one is installed, Press and hold the CMA release tab.
c. Rotate the cable management arm out of the way so that you can access the power supply. (If necessary extend the server approximately 20 cm (8 inches) out of the front of the rack to gain access to the power supply)
d. Disconnect the power cord from the failed power supply.
e. If both power supplies will be removed for any reason label each power supply with the slot number from which it was removed (PS0, PS1) so that any supply that is not replaced with a new part can be re-installed to the same slot from which it was removed so that FRU TLI data is not lost.
f. Grasp the power supply handle and push the power supply latch to the left.
g. Pull the power supply out of the chassis and set it aside on an antistatic mat.
3. Install the replacement Power Supply
a. Remove the replacement power supply from its packaging and place it on an antistatic mat.
b. Align the power supply with the empty power supply bay.
c. Slide the power supply into the bay until it is fully seated. (an audible click will be heard when it is fully seated)
d. Reconnect the power cord to the power supply.
e. Verify that the amber LED on the replaced power supply and the Service Required LEDs on the chassis are not lit.
4.Return the Server to operation
a. If you pulled the server out of the rack to make it easier to remove the power supply, push the server into the rack until the slide-rail locks (on the front of the server) engage the slide-rail assemblies.
b. If a cable management arm is installed and was removed to access the power supply reattach the CMA clip to the slide rail.
c. Check all power and data cables to ensure that no connections were disturbed during the service.
d. Verify that the Power/OK indicator led lights steady on and that system is operating properly.
WHAT ACTIONS ARE REQUIRED TO RETURN THE SYSTEM TO AN OPERATIONAL STATE?:
N/A
REFERENCE INFORMATION:
Oracle Server X5-4 Documentation: https://docs.oracle.com/cd/E56388_01/html/E56396/z4000fb41299014.html#scrolltoc
Attachments
This solution has no attachment