Sun Microsystems, Inc.  Oracle System Handbook - ISO 7.0 May 2018 Internal/Partner Edition
   Home | Current Systems | Former STK Products | EOL Systems | Components | General Info | Search | Feedback

Asset ID: 1-71-1989574.1
Update Date:2017-02-03
Keywords:

Solution Type  Technical Instruction Sure

Solution  1989574.1 :   How to Perform Installation of an Upper Cable Harness for Exadata X5-2/X6-2, ZDLRA X5/X6 Upgrades [VCAP]  


Related Items
  • Zero Data Loss Recovery Appliance X6 Hardware
  •  
  • Exadata X5-2 Hardware
  •  
  • Exadata X6-2 Hardware
  •  
  • Exadata X5-2 Quarter Rack
  •  
  • Zero Data Loss Recovery Appliance X5 Hardware
  •  
  • Exadata X5-2 Half Rack
  •  
Related Categories
  • PLA-Support>Sun Systems>Sun_Other>Sun Collections>SN-OTH: x64-CAP VCAP
  •  
  • Microlearning>Video>ML-VID-VCAP
  •  




Oracle Confidential PARTNER - Available to partners (SUN).
Reason: Procedure for Oracle Field Service engineers and service partners only

Applies to:

Exadata X5-2 Hardware - Version All Versions and later
Zero Data Loss Recovery Appliance X5 Hardware - Version All Versions and later
Exadata X5-2 Quarter Rack - Version All Versions and later
Exadata X5-2 Half Rack - Version All Versions and later
Exadata X6-2 Hardware - Version All Versions and later
x86_64

Goal

How to Install the Upper Cable Harness on Engineered Systems including Exadata X5 and ZDLRA X5 during field upgrade installations.

Solution

DISPATCH INSTRUCTIONS

WHAT SKILLS DOES THE FIELD ENGINEER/ADMINISTRATOR NEED?: Exadata trained

TIME ESTIMATE: 240 Minutes

TASK COMPLEXITY: 3

 

PROBLEM OVERVIEW:

With the introduction of elastic configurations on Exadata and ZDLRA platforms, there are numerous scenarios that will require the installation of the upper cable harness.  Most field upgrades that require installation of hardware into the upper half of the rack for the first time will require installing the upper rack cable harness kit.

This Video  will go through the inventory of expected parts, cover the process for installing both the ethernet and InfiniBand cable harnesses into an Exadata or ZDLRA rack, and how to properly secure them in the rack.

COMPLEXITY: 3

FIELD ENGINEER INSTRUCTIONS:

Field Engineers should review this training prior to installing an upper cable harness in any of the Engineered Systems that require them.

 

WHERE IS THE TRAINING?

The training is available on EDP and Oracle University at the following links;

EDP Link:  http://edp.oraclecorp.com/lms/faces/lms/edp/plancurrassignments.jspx?planid=200004

iLearn Link:  http://oukc.oracle.com/static12/opn/login/?t=checkusercookies%7Cr=-1%7Cc=1628916134

 

The videos can be downloaded from within the training for offline viewing.

This document is also referenced in the EIS Checklists for Upgrade procedures on Engineered Systems, where applicable.

Access the latest EIS checklist here:  http://eis.us.oracle.com/checklists/checklists.html