![]() | Oracle System Handbook - ISO 7.0 May 2018 Internal/Partner Edition | ||
|
|
![]() |
||||||||||||||
Solution Type Technical Instruction Sure Solution 1958743.1 : OSSI Product Installation: B62004 Storage - Switches - Group III BF1-4, Sun Datacenter Switch 36, 32-80 Port Switch Installations
In this Document
Oracle Confidential PARTNER - Available to partners (SUN). Applies to:Brocade 5100 Switch - Version All Versions to All Versions [Release All Releases]Sun Network Switch - Version All Versions to All Versions [Release All Releases] Brocade 6510 Fabric Switch - Version All Versions to All Versions [Release All Releases] Sun Datacenter InfiniBand Switch 36 - Version All Versions to All Versions [Release All Releases] Brocade 5300 Switch - Version All Versions to All Versions [Release All Releases] Information in this document applies to any platform. GoalProvide information instructions for installing certain switches. SolutionDISPATCH INSTRUCTIONS
WHAT SKILLS DOES THE FIELD ENGINEER/ADMINISTRATOR NEED? Broad understanding of switches installation knowledge.
TASK COMPLEXITY: 3 FIELD ENGINEER/ADMINISTRATOR INSTRUCTIONS:
PROBLEM OVERVIEW: Please use the following information when performing installations. EIS Checklists can be found at http://eis.us.oracle.com/checklists/checklists.html.
Install deliverables, if available, can be found at http://eis.us.oracle.com/eisdeliverables.html.
EIS Planning documents, if needed, can be found at http://eis.us.oracle.com/eisPlanningDoc.html
WHAT STATE SHOULD THE SYSTEM BE IN TO BE READY TO PERFORM THE RESOLUTION ACTIVITY ?: To be determined by the engineer.
WHAT ACTION DOES THE FIELD ENGINEER/ADMINISTRATOR NEED TO TAKE ?: Install system per EIS Methodology. Attachments This solution has no attachment |
||||||||||||||
|