![]() | Oracle System Handbook - ISO 7.0 May 2018 Internal/Partner Edition | ||
|
|
![]() |
||||||||||||||
Solution Type Technical Instruction Sure Solution 1958739.1 : OSSI Product Installation: B62001 Storage - Switches - Group II Brocade 300, 7800/8000, 8-24 port switch installations
In this Document
Oracle Confidential PARTNER - Available to partners (SUN). Applies to:Brocade 300 Switch - Version All Versions to All Versions [Release All Releases]Oracle Switch ES1-24 - Version All Versions to All Versions [Release All Releases] Sun Network QDR InfiniBand Gateway Switch - Version All Versions to All Versions [Release All Releases] Sun StorageTek Crypto Key Management System - Version All Versions to All Versions [Release All Releases] Brocade 8000 FCoE Switch - Version All Versions to All Versions [Release All Releases] Information in this document applies to any platform. GoalGoal is to provide the engineer with installation instructions for low-end switches SolutionDISPATCH INSTRUCTIONS: THIS IS AN INSTALL TASK, AND SHOULD BE DISPATCHED DURING LOCAL BUSINESS HOURS ONLY! WHAT STATE SHOULD THE SYSTEM BE IN TO BE READY TO PERFORM THE RESOLUTION ACTIVITY?: System will be 'installed' if EIS checklist is followed. WHAT ACTION DOES THE FIELD ENGINEER/ADMINISTRATOR NEED TO TAKE?: Install system per EIS Methodology. Attachments This solution has no attachment |
||||||||||||||
|