Sun Microsystems, Inc.  Oracle System Handbook - ISO 7.0 May 2018 Internal/Partner Edition
   Home | Current Systems | Former STK Products | EOL Systems | Components | General Info | Search | Feedback

Asset ID: 1-71-1958728.1
Update Date:2017-04-10
Keywords:

Solution Type  Technical Instruction Sure

Solution  1958728.1 :   OSSI Product Installation: B61998 Storage - Switches - Group I Line Cards and Blade Switches Installation  


Related Items
  • Brocade FCoE 10-24 Blade
  •  
  • Oracle Fabric Interconnect F1-15
  •  
  • Brocade FR4-18i Director Blade
  •  
  • Brocade FX8-24 Extension Blade
  •  
Related Categories
  • PLA-Support>Sun Systems>Sun_Other>Sun Collections>SN-OTH: DISK-CAP VCAP
  •  




In this Document
Goal
Solution


Oracle Confidential PARTNER - Available to partners (SUN).
Reason: EIS Methodology is not customer facing information

Applies to:

Oracle Fabric Interconnect F1-15 - Version All Versions to All Versions [Release All Releases]
Brocade FX8-24 Extension Blade - Version All Versions to All Versions [Release All Releases]
Brocade FCoE 10-24 Blade - Version All Versions to All Versions [Release All Releases]
Brocade FR4-18i Director Blade - Version All Versions to All Versions [Release All Releases]
Information in this document applies to any platform.

Goal

  Goal is to provide the engineer with installation instructions for certain switches.

Solution

DISPATCH INSTRUCTIONS

 

WHAT SKILLS DOES THE FIELD ENGINEER/ADMINISTRATOR NEED?  High understanding of complex storage library installation knowledge.

 

TIME ESTIMATE: 60 minutes

 

TASK COMPLEXITY: 3

 

FIELD ENGINEER/ADMINISTRATOR INSTRUCTIONS:
  

PROBLEM OVERVIEW:  Please use the following information when performing installations.

EIS Checklists can be found at http://eis.us.oracle.com/checklists/checklists.html.

Install deliverables, if available, can be found at http://eis.us.oracle.com/eisdeliverables.html.

EIS Planning documents, if needed, can be found at http://eis.us.oracle.com/eisPlanningDoc.html

  

WHAT STATE SHOULD THE SYSTEM BE IN TO BE READY TO PERFORM THE RESOLUTION ACTIVITY ?:  To be determined by the field engineer.

 

WHAT ACTION DOES THE FIELD ENGINEER/ADMINISTRATOR NEED TO TAKE ?:  Install system per EIS Methodology.