Solution Type  Technical Instruction Sure

Solution  1937659.1 :   Platform Power Cord Replacement Procedure  


Related Items
  • Sun Rack 900-38
  •  
  • Sun Blade 6048 System
  •  
  • Sun Storage 6580 Array
  •  
  • Sun Storage 6780 Array
  •  
  • Sun Rack 1000-42
  •  
  • Sun Rack II 1042
  •  
  • Sun Rack 1000-38
  •  
  • Sun SPARC Enterprise M4000 Server
  •  
  • Sun Blade 6000 System
  •  
  • Sun Blade 8000 P System
  •  
  • Sun Rack 900-36N
  •  
  • Sun SPARC Enterprise M5000 Server
  •  
  • Sun Blade 8000 System
  •  
  • Sun Storage 6540 Array
  •  
  • Sun Rack II 1242
  •  
Related Categories
  • PLA-Support>Sun Systems>Sun_Other>Sun Collections>SN-OTH: SPARC-CAP VCAP
  •  




In this Document
Goal
Solution


Applies to:

Sun Rack 1000-38 - Version Not Applicable to Not Applicable [Release NA]
Sun Blade 6048 System - Version Not Applicable to Not Applicable [Release N/A]
Sun SPARC Enterprise M4000 Server - Version Not Applicable to Not Applicable [Release N/A]
Sun SPARC Enterprise M5000 Server - Version Not Applicable to Not Applicable [Release N/A]
Sun Blade 8000 P System - Version All Versions to All Versions [Release All Releases]
Information in this document applies to any platform.

Goal

Replace all power cords on the system, destroy and dispose of the old power cords

Solution

DISPATCH INSTRUCTIONS

WHAT SKILLS DOES THE ENGINEER/ADMINISTRATOR NEED:
No specific training required.  This is a Customer Replaceable Unit (CRU).

TASK COMPLEXITY: 0

TIME ESTIMATE: 30 minutes

FIELD ENGINEER/ADMINISTRATOR INSTRUCTIONS

TOOLS REQUIRED: N/A

WHAT STATE SHOULD THE SYSTEM BE IN TO BE READY TO PERFORM THE RESOLUTION ACTIVITY? :

For non-redundant power configurations the system will need to be down.  For redundant power configurations the system may remain up

WHAT ACTION DOES THE ENGINEER/ADMINISTRATOR NEED TO TAKE:

 

If you determine that the platform has redundant power, it is recommended to follow the redundant power supply procedure below instead of powering off the system.  After replacing the affected power cords cut the female end of the cord off at least 4 inches from the plug and disposed of both pieces of the cord so they cannot be re-used.

If the system does not have redundant power supplies:

  1. Ensure the entire platform is shutdown and powered off
  2. Unplug all power cords from the source power (male) end at the same time
  3. Unplug the power cords from the platform (female end)
  4. Replace the power cords by plugging the female end into the platform first

If the platform does have redundant power supplies:

  1. Ensure all power supplies are providing power and functioning normally
  2. Unplug  the first power cord from the source power (male) end first
  3. Unplug the first power cord from the platform (female) end
  4. Replace the power cord by plugging  the female end into the platform first
  5. Ensure that all power supplies are again providing power and functioning normally
  6. Repeat steps 1 – 5 for each suspected power cord on the platform

Replacing cords which are connecting the rack power strips to datacenter power

  1. Determine which systems have redundant power across the rack power strips
  2. Poweroff systems that do not have redundant power across rack power strips
  3. Unplug the first rack power strip cord by unplugging the source power (male) end first
  4. Replace the power cord by plugging in the female end into the rack power strip first
  5. Ensure redundant power has been restored to all redundant systems in the rack
  6. Repeat steps 2-5 for each affected rack strip power cord
  7. Restart any systems powered off in step 2

Please consult your system's service manual for detailed instructions. You can find your system's service manual here: https://www.oracle.com/technetwork/indexes/documentation/index.html?ssSourceSiteId=ocomen

More information on this issue can be found at http://www.oracle.com/us/support/power-cord-replacement/index.html

OBTAIN CUSTOMER ACCEPTANCE

WHAT ACTION DOES THE CUSTOMER NEED TO TAKE TO RETURN THE SYSTEM TO AN OPERATIONAL STATE:

For non-redundant power configurations the system will need to be powered on.  For redundant power configurations there is no action necessary

PARTS NOTE:

REFERENCE INFORMATION:

Service Manual: https://www.oracle.com/technetwork/indexes/documentation/index.html?ssSourceSiteId=ocomen