Sun Microsystems, Inc.  Oracle System Handbook - ISO 7.0 May 2018 Internal/Partner Edition
   Home | Current Systems | Former STK Products | EOL Systems | Components | General Info | Search | Feedback

Asset ID: 1-71-1932003.1
Update Date:2017-11-30
Keywords:

Solution Type  Technical Instruction Sure

Solution  1932003.1 :   How to Replace a SPARC T4-2 Cable Kit:ATR:1932003.1:0  


Related Items
  • SPARC T4-2
  •  
Related Categories
  • PLA-Support>Sun Systems>Sun_Other>Sun Collections>SN-OTH: SPARC-CAP VCAP
  •  




In this Document
Goal
Solution


Applies to:

SPARC T4-2 - Version All Versions and later
Information in this document applies to any platform.

Goal

Service the SPARC T4-2 cable kit

******************************************************************************
To report errors or request improvements on this procedure,
please put a comment on Doc ID: 1416043.1
******************************************************************************

Solution

DISPATCH INSTRUCTIONS

WHAT SKILLS ARE REQUIRED?: No special skills required, Customer Replaceable Unit (CRU) procedure

Time Estimate: 60 minutes

TASK COMPLEXITY: 0

REMOVAL/REPLACEMENT INSTRUCTIONS:

PROBLEM OVERVIEW: cable kit replacement

WHAT STATE SHOULD THE SYSTEM BE IN TO BE READY TO PERFORM THE RESOLUTION ACTIVITY? :

DAMAGE ALERT: Perform a visual inspection of the replacement part to make sure that there are no damaged components, connectors, bent pins, damaged packages during shipping, etc. If the part is damaged, don't install it into the system, order a new part. Handle with caution and package carefully the return part to avoid any damages during shipping.


The customer should conduct an orderly software system shutdown (shut the operating system down gracefully, using "init 5"). Then power down system and remove power cords.

WHAT ACTIONS ARE REQUIRED?:

*** Follow standard ESD procedures to avoid Electrostatic Discharge

1. Power off server
2. Disconnect all power cables
3. Disconnect any data cables connected to any PCIe/XAUI card if needed
4. Remove the Top Cover
1. To unlatch the server top cover, insert your fingers under the two cover latches
   and simultaneously lift both latches in an upward motion.
2. Lift the cover slightly and slide it toward the front of the server chassis about
   0.5 inch (12 mm).
3. Lift up and remove the top cover
5. Replace cables routing them as they were before
6. After replacement reverse the order of fixing as mentioned in above points

OBTAIN CUSTOMER ACCEPTANCE

WHAT ACTIONS ARE REQUIRED TO RETURN THE SYSTEM TO AN OPERATIONAL STATE?:
Boot system and monitor boot sequence for errors. Test functionality of system, check all disks access. Restart software applications per applicable administration guides to resume system operation.

PARTS NOTE: refer to system handbook

SPARC T4-2: https://support.oracle.com/handbook_private/Systems/SPARC_T4_2/components.html


REFERENCE INFORMATION: SPARC T4-2 Server Service Manual http://docs.oracle.com/cd/E23075_01/pdf/E23078.pdf


Attachments
This solution has no attachment
  Copyright © 2018 Oracle, Inc.  All rights reserved.
 Feedback