Sun Microsystems, Inc.  Oracle System Handbook - ISO 7.0 May 2018 Internal/Partner Edition
   Home | Current Systems | Former STK Products | EOL Systems | Components | General Info | Search | Feedback

Asset ID: 1-71-1640403.1
Update Date:2017-11-30
Keywords:

Solution Type  Technical Instruction Sure

Solution  1640403.1 :   How to Remove and Replace a Netra T1 AC200/DC200 Server Power Supply:ATR:1640403.1:1  


Related Items
  • Sun Netra T1 Hardware
  •  
  • Sun Netra T1 AC200 Server
  •  
  • Sun Netra T1 DC200 Server
  •  
Related Categories
  • PLA-Support>Sun Systems>Sun_Other>Sun Collections>SN-OTH: SPARC-CAP VCAP
  •  




In this Document
Goal
Solution


Oracle Confidential INTERNAL - Do not distribute to customer (OracleConfidential).
Reason: Netra T1 AC200/DC200 are FRU parts so internal

Applies to:

Sun Netra T1 Hardware - Version Not Applicable to Not Applicable [Release N/A]
Sun Netra T1 AC200 Server - Version Not Applicable to Not Applicable [Release N/A]
Sun Netra T1 DC200 Server - Version Not Applicable to Not Applicable [Release N/A]
Information in this document applies to any platform.

Goal

 How to Remove and Replace a Netra T1 AC200/DC200 Power Supply

*********************************************************************
To report errors or request improvements on this procedure,
please Add a Comment on Doc ID: 1527058.1
*********************************************************************

Solution

DISPATCH INSTRUCTIONS WHAT SKILLS DOES THE FIELD ENGINEER/ADMINISTRATOR NEED?:

Netra T1 AC200/DC200 product training is desirable but not required

TIME ESTIMATE: 40 mins

TASK COMPLEXITY: 1

FIELD ENGINEER/ADMINISTRATOR INSTRUCTIONS:

PROBLEM OVERVIEW: PSU failure

WHAT STATE SHOULD THE SYSTEM BE IN TO BE READY TO PERFORM THE RESOLUTION ACTIVITY?:

If a data backup is not required it is still a wise precaution.

WHAT ACTION DOES THE FIELD ENGINEER/ADMINISTRATOR NEED TO TAKE?:

Replacing the Power Supply

Caution – The procedure below is for the attention of qualified service engineers only. Before touching or replacing any components inside the Netra T1 server,
disconnect all cables and open the server. Always place the server on a grounded ESD pad and wear a properly grounded antistatic wrist strap.

1. Open the Netra T1 server. Make sure all external cables are disconnected and pay particular attention to the information about how to prevent electrostatic discharge from your body from damaging the components of the server.

2. With the server open and seated on top of a grounded ESD pad, and with a properly grounded antistatic wrist strap on your wrist, disconnect the power
supply cables from the system board.

3. Undo the two rear fixing screws

4. Move the power supply unit (PSU) towards the front of the system to release it from the location tabs in the base. Lift it away from the chassis.

5. Lift the new PSU over the location tabs and slide it backwards into place.

6. Secure the two rear fixing screws.

7. Connect the power supply cables to the connectors on the system board.

8. Replace the server’s cover and tighten the captive screw.

OBTAIN CUSTOMER ACCEPTANCE WHAT ACTION DOES THE FIELD ENGINEER/ADMINISTRATOR NEED TO TAKE TO
RETURN THE SYSTEM TO AN OPERATIONAL STATE:

Boot the system and verify all components are working properly.

PARTS NOTE:

https://mosemp.us.oracle.com/handbook_internal/Systems/Netra_T1_AC200/components.html

https://mosemp.us.oracle.com/handbook_internal/Systems/Netra_T1_DC200/components.html

 

REFERENCE INFORMATION:

Netra T1 AC200/DC200 Server User's Guide: http://docs.oracle.com/cd/E19102-01/nt1.ac200.srvr/


Attachments
This solution has no attachment
  Copyright © 2018 Oracle, Inc.  All rights reserved.
 Feedback