![]() | Oracle System Handbook - ISO 7.0 May 2018 Internal/Partner Edition | ||
|
|
![]() |
||||||||||||||||||||||||||||||||||||||||
Solution Type Technical Instruction Sure Solution 1605011.1 : How to Replace an Acme Packet Net-Net 4250 Chassis [VCAP]
In this Document
Oracle Confidential PARTNER - Available to partners (SUN). Applies to:Net-Net 4250 - Version C5.x.x and laterAcme Packet OS GoalHow to replace a Acme Packet 4250 chassis SolutionDISPATCH INSTRUCTIONSThis task relates to service of an ACME PACKET product. Parts specified in this task should be delivered using a cost effective next day delivery method, and may require to be back ordered from a Tier 1 location. The Planned End Date should be set to a time on the second business day to enable this, unless specific instructions from the TSC engineer indicate otherwise. Refer to https://stbeehive.oracle.com/content/dav/st/GDMI/Public/REFBF134.htm or specific instructions. WHAT SKILLS DOES THE FIELD ENGINEER/ADMINISTRATOR NEED?:Acme Packet NN4250 Training. Note: #2 Philips is required
TIME ESTIMATE: 90 minutesTASK COMPLEXITY: 4FIELD ENGINEER/ADMINISTRATOR INSTRUCTIONS:PROBLEM OVERVIEW:Acme Packet 4250 Chassis Replacement WHAT STATE SHOULD THE SYSTEM BE IN TO BE READY TO PERFORM THE RESOLUTION ACTIVITY? :A data backup is not a prerequisite, but is a wise precaution. If the system is still up and functioning, customer should perform an orderly and graceful shutdown of applications, OS and logically removing the Acme Packet 4250 system from the network. Then power off the server and remove the power cords and all other cabling from the system. Note:The replacement chassis does not contain a security module (SSM), 256K CAM card, or add-on memory. These items need to be removed from the failed unit and installed into the replacement chassis.
WHAT ACTION DOES THE FIELD ENGINEER/ADMINISTRATOR NEED TO TAKE?:Prepare the server for service
Opening chassis
Locating the SSM, 256K CAM card, and Memory DIMM SSM card
256K CAM card
Replacement chassis includes the original 256K CAM module, 002-0403-51. Customer may have purchased upgrade CAM, 002-0514-50 Memory DIMM
Install these devices in the replacement chassis 4. Installing top lid
5: Install the physical interface card and power supplies that were set aside earlier 6. Install chassis into rack
7. Power on server. Verify that the Power/OK indicator led lights steady on. Memory is validated at boot time "total processor memory: xxxxMB"
OBTAIN CUSTOMER ACCEPTANCEWHAT ACTION DOES THE FIELD ENGINEER/ADMINISTRATOR NEED TO TAKE TO RETURN THE SYSTEM TO AN OPERATIONAL STATE?:A: Legacy customer will need to request a new license key to enable the software to function correctly. License keys are tied to the chassis serial number.
http://www.oracle.com/us/support/licensecodes/index.html
- Old and new chassis serial number - License Key for existing system - SR (Service Request) number that was assigned for this issue - Software name/revision
B: Restore the boot image and configuration setting on the replacement system REFERENCE INFORMATION:Acme Packet Legacy Hardware Documentation Attachments This solution has no attachment |
||||||||||||||||||||||||||||||||||||||||
|