Sun Microsystems, Inc.  Oracle System Handbook - ISO 7.0 May 2018 Internal/Partner Edition
   Home | Current Systems | Former STK Products | EOL Systems | Components | General Info | Search | Feedback

Asset ID: 1-71-1597503.1
Update Date:2017-05-09
Keywords:

Solution Type  Technical Instruction Sure

Solution  1597503.1 :   Acme Packet: How To Verify Power Supply Status  


Related Items
  • Acme Packet 4500
  •  
  • Net-Net 4250
  •  
  • Net-Net 3810
  •  
  • Acme Packet 3820
  •  
Related Categories
  • PLA-Support>Sun Systems>CommsGBU>Session Delivery Network>SN-SND: Acme Service Provider
  •  




In this Document
Goal
Solution


Applies to:

Acme Packet 4500
Acme Packet 3820
Net-Net 3810
Net-Net 4250
Acme Packet OS

Goal

 How to verify power supply status.

Solution

When starting software version C6.0, the show power command shows the Net-Net SBC (session border controller) power supply information including the state of the power supply and the installation position.

ACMEPACKET# show power
Power Supply A (left): ON
Power Supply B (right): OFF or Not Present

 


Attachments
This solution has no attachment
  Copyright © 2018 Oracle, Inc.  All rights reserved.
 Feedback