Sun Microsystems, Inc.  Oracle System Handbook - ISO 7.0 May 2018 Internal/Partner Edition
   Home | Current Systems | Former STK Products | EOL Systems | Components | General Info | Search | Feedback

Asset ID: 1-71-1554072.1
Update Date:2016-10-07
Keywords:

Solution Type  Technical Instruction Sure

Solution  1554072.1 :   How To Replace a Transceiver (SFP) on Qlogic 9000 Fibre Channel (FC) Series Switch  


Related Items
  • Qlogic SANbox 9100 Switch
  •  
  • Qlogic SANbox 9200 Switch
  •  
Related Categories
  • PLA-Support>Sun Systems>Sun_Other>Sun Collections>SN-OTH: DISK-CAP VCAP
  •  




In this Document
Goal
Solution


Applies to:

Qlogic SANbox 9100 Switch - Version Not Applicable to Not Applicable [Release N/A]
Qlogic SANbox 9200 Switch - Version Not Applicable to Not Applicable [Release N/A]
Information in this document applies to any platform.

Goal

How to replace a transceiver (SFP) on Qlogic 9000 series switch 

Solution

  DISPATCH INSTRUCTIONS
   WHAT SKILLS DOES THE FIELD ENGINEER/ADMINISTRATOR NEED?:
Field Engineer/Administrator will want to be familiar with Qlogic switches.
   TIME ESTIMATE: 1 minute
   TASK COMPLEXITY: 0 

FIELD ENGINEER/ADMINISTRATOR INSTRUCTIONS:
   PROBLEM OVERVIEW: An SFP has failed or is suspected faulty and needs replacement.
   WHAT STATE SHOULD THE SYSTEM BE IN TO BE READY TO PERFORM THE RESOLUTION ACTIVITY?:

Replacing Transceivers (SFP's) and Stacking Cables

 

The transceivers and stacking cables can be removed and replaced while the
switch is operating without damaging the switch or the transceiver. However,
transmission on the affected port will be interrupted until the transceiver is
installed and reconnected. To remove a transceiver, pull on the release tab or
lever and remove the transceiver. Different transceiver manufacturers have
different release mechanisms. Consult the documentation for your transceiver. To
install, insert the transceiver into the port and gently press until it snaps in place.
The transceiver will fit only one way. If the transceiver does not install under gentle
pressure, flip it over and try again.

 

OBTAIN CUSTOMER ACCEPTANCE
WHAT ACTION DOES THE FIELD ENGINEER/ADMINISTRATOR NEED TO TAKE TO RETURN THE SYSTEM TO AN OPERATIONAL STATE?: N/A

 

PARTS NOTE:  None

REFERENCE INFORMATION: QLogic 9000 Series Stackable Chassis Switch Installation Guide




Attachments
This solution has no attachment
  Copyright © 2018 Oracle, Inc.  All rights reserved.
 Feedback