Sun Microsystems, Inc.  Oracle System Handbook - ISO 7.0 May 2018 Internal/Partner Edition
   Home | Current Systems | Former STK Products | EOL Systems | Components | General Info | Search | Feedback

Asset ID: 1-71-1547641.1
Update Date:2016-01-20
Keywords:

Solution Type  Technical Instruction Sure

Solution  1547641.1 :   Mx-32 - How to Replace a Faulty Cable Management Assembly  


Related Items
  • SPARC M5-32
  •  
  • SPARC M6-32
  •  
  • Oracle SuperCluster M6-32 Hardware
  •  
Related Categories
  • PLA-Support>Sun Systems>Sun_Other>Sun Collections>SN-OTH: SPARC-CAP VCAP
  •  




In this Document
Goal
Solution
References


Oracle Confidential INTERNAL - Do not distribute to customer (OracleConfidential).
Reason: FRU CAP

Applies to:

SPARC M5-32 - Version All Versions and later
SPARC M6-32 - Version All Versions and later
Oracle SuperCluster M6-32 Hardware - Version All Versions and later
Information in this document applies to any platform.

Goal

CAP PROBLEM OVERVIEW: Mx-32 -  How to Replace a Faulty Cable Management Assembly


To report errors or request improvements on this procedure, please go to My Oracle Support, and put a comment on Doc ID: 1547641.1


 

ESD Caution:
  • Circuit boards and drives contain electronic components that are  extremely sensitive to static electricity. Ordinary amounts of static electricity from clothing or the work environment can destroy the components located on these boards. Do not touch the components along their connector edges.
  • Use a Antistatic Wrist strap. Attach one end of the strap to your wrist and the other end to the chassis, depending on what type of strap you use, with the adhesive end or the metal plug.
  • Use an Antistatic Mat. Place ESD-sensitive components such as motherboards, memory, and other PCBs on an antistatic mat.

 

Contamination Caution:
  • Dust particles of packaging material are number one cause of datacenter contamination. Make sure to remove all packaging material, up to the ESD safe packaging material, while still being outside the datacenter.

Solution

DISPATCH INSTRUCTIONS

WHAT SKILLS DOES THE ENGINEER NEED: Mx-32 Product Training/Experience

TASK COMPLEXITY: 1

TIME ESTIMATE: 60 minutes

HOT replacement

FIELD ENGINEER INSTRUCTIONS

WHAT STATE SHOULD THE SYSTEM BE IN TO BE READY TO PERFORM THE RESOLUTION ACTIVITY? : n.a.

WHAT ACTION DOES THE ENGINEER NEED TO TAKE:

1. Remove all cable ties and bindings that hold IO cables to the faulty cable management assembly and move the cables aside, without disturbing their connections

2. Lift the Faulty cable management assembly free from the upper and lower hinge posts

3. Put the Faulty cable management assembly into its ESD safe packaging

4. Place the upper hinge of the replacement cable management assembly over the upper hinge post

5. Place the lower hinge on the lower hinge post

6. Verify that the cable management assembly is able to pivot freely

7. Attach the IO cables to the cable management assembly, leave some slack in the cables so that the louver can move freely.

Caution:  Do not overtighten tie wraps or other binding devices. IO cables might be damaged

8. Prepare the faulted cable management assembly outside the datacenter for return to Oracle.

 

======================== Other info =====================

REFERENCE INFORMATION:  Service Manual: https://www.oracle.com/technetwork/documentation/oracle-sparc-ent-servers-189996.html


Attachments
This solution has no attachment
  Copyright © 2018 Oracle, Inc.  All rights reserved.
 Feedback