Solution Type Technical Instruction Sure Solution 1541029.1 : Mx-32 How to Repair a Faulty System Bus Bar
M5-32 How to Repair a Faulty System Bus Bar In this Document
Oracle Confidential INTERNAL - Do not distribute to customer (OracleConfidential). Applies to:SPARC M5-32 - Version All Versions and laterSPARC M6-32 - Version All Versions and later Oracle SuperCluster M6-32 Hardware - Version All Versions and later Information in this document applies to any platform. The System Bus Bar is a cold-service component that can only be serviced by authorized service personnel. GoalCAP PROBLEM OVERVIEW: Mx-32 - System Bus Bar To report errors or request improvements on this procedure, please go to My Oracle Support, and put a comment on Doc ID: 1541029.1 ************************************************************************* ESD Caution:
Contamination Caution:
NOTICE: The component specified for replacement in this action plan requires a Genie Lift. The lift is required not only for the safety of the servicing engineer, but also for the successful implementation of the replacement procedure. Any of the following parts may be ordered to satisfy the Genie Lift requirement:
370-4286 Genie Lift w/straddle base 371-4170 Genie Lift w/Cntr-weight Base Adj 370-6889 Genie Lift w/counter-weight base 370-6888 Genie Lift w/standard base Depending on the region/country, the order lead-time for the Genie Lift may be longer than other parts. DO NOT ATTEMPT THE REPLACEMENT PROCEDURE WITHOUT THE REQUIRED GENIE LIFT. SolutionDISPATCH INSTRUCTIONS WHAT SKILLS DOES THE ENGINEER NEED: Mx-32 Product Training/Experience TASK COMPLEXITY: 4 TIME ESTIMATE: 180 minutes COLD replacement FIELD ENGINEER INSTRUCTIONS WHAT STATE SHOULD THE SYSTEM BE IN TO BE READY TO PERFORM THE RESOLUTION ACTIVITY? : Physical Domains must be shut down. Server must be powered off. WHAT ACTION DOES THE ENGINEER NEED TO TAKE: Caution – The repair of a System Bus Bar requires the removal of the Power System Cage. The empty power system cage weighs 207 lbs (94kg). At least two people and a mechanical lifting device are required for the procedure. Complete the 'Servicing Bus Bars' procedure outlined in the M5-32 Service Manual to replace the failed component.