Mx-32 - How to Replace a Faulty Rear LED Panel
Related Items |
- SPARC M5-32
- SPARC M6-32
- Oracle SuperCluster M6-32 Hardware
|
Related Categories |
- PLA-Support>Sun Systems>Sun_Other>Sun Collections>SN-OTH: SPARC-CAP VCAP
|
In this Document
Oracle Confidential INTERNAL - Do not distribute to customer (OracleConfidential).
Reason: FRU CAP
Applies to:
Oracle SuperCluster M6-32 Hardware - Version All Versions and later
SPARC M6-32 - Version All Versions and later
SPARC M5-32 - Version All Versions and later
Information in this document applies to any platform.
Goal
CAP PROBLEM OVERVIEW: Mx-32 - Faulty Rear LED Panel
To report errors or request improvements on this procedure, please go to My Oracle Support, and put a comment on Doc ID: 1531285.1
ESD Caution:
- Circuit boards and drives contain electronic components that are extremely sensitive to static electricity. Ordinary amounts of static electricity from clothing or the work environment can destroy the components located on these boards. Do not touch the components along their connector edges.
- Use a Antistatic Wrist strap. Attach one end of the strap to your wrist and the other end to the chassis, depending on what type of strap you use, with the adhesive end or the metal plug.
- Use an Antistatic Mat. Place ESD-sensitive components such as motherboards, memory, and other PCBs on an antistatic mat.
Contamination Caution:
- Dust particles of packaging material are number one cause of datacenter contamination. Make sure to remove all packaging material, up to the ESD safe packaging material, while still being outside the datacenter.
Solution
DISPATCH INSTRUCTIONS
WHAT SKILLS DOES THE ENGINEER NEED: Mx-32 Product Training/Experience
TASK COMPLEXITY: 1
TIME ESTIMATE: 120 minutes COLD replacement
FIELD ENGINEER INSTRUCTIONS
WHAT STATE SHOULD THE SYSTEM BE IN TO BE READY TO PERFORM THE RESOLUTION ACTIVITY? : The system needs to be powered off
WHAT ACTION DOES THE ENGINEER NEED TO TAKE:
1. Halt the server and turn off all AC power:
- Turn the key switch on the Front Panel of the server to the Service position.
- Gracefully shutdown the server by running the ILOM command "stop /System" (requires Oracle ILOM Reset and Host Control (r) user role).
- Turn off all external breakers for the server.
- For maximum safety, disconnect all six power cords from their respective AC outlets.
2. Verify that it is safe to remove the Rear LED Panel:
- All six external breakers for the server must be in the Off position.
- All six power cords for this server must be unplugged from their respective AC outlets.
- No LEDs on the server should be lighted.
- You should not hear any fans running in the server.
3. Use a grounding strap to protect the equipment from ESD damage.
4. Locate the Faulty Rear LED Panel at the rear of the chassis.
5. Remove the Faulty Rear LED Panel:
- Use a Torx T10 screwdriver to remove two mounting screws from the ends of the rear LED panel.
- Pull the rear LED panel out of its slot and disconnect the interface cable.
6. Unpack the replacement Rear LED Panel from its ESD safe packaging.
7. Pack the faulty Rear LED Panel into its ESD safe packaging.
8. Install the replacement Rear LED Panel:
- Connect the interface cable to the rear LED panel.
- Push the interface cable into the opening at the rear of the slot while you put the rear LED panel in the slot.
- Use a Torx T10 screwdriver to install the screws at the sides of the rear LED panel.
9. Verify all six external breakers are still in the Off position.
10. Warn bystanders that you are preparing to restart the server.
11. Turn on all AC power and start the server:
- Connect all six AC cords to their respective AC outlets.
- Turn on all external breakers for the server.
- Turn the key switch on the Front Panel of the server to the On position.
- Start the server by running the ILOM command "start /System" (requires Oracle ILOM Reset and Host Control (r) user role).
12. Prepare the faulted Rear LED Panel outside the datacenter for return to Oracle.
OBTAIN CUSTOMER ACCEPTANCE
WHAT ACTION DOES THE CUSTOMER NEED TO TAKE TO RETURN THE SYSTEM TO AN OPERATIONAL STATE:
Restart software applications per applicable administration guides to resume system operation.