![]() | Oracle System Handbook - ISO 7.0 May 2018 Internal/Partner Edition | ||
|
|
![]() |
||||||||||||||
Solution Type Technical Instruction Sure Solution 1530068.1 : Fujitsu M10-4S - How to replace a XSCF Dual Cable from a BB to a BB
In this Document
Oracle Confidential INTERNAL - Do not distribute to customer (OracleConfidential). Applies to:Fujitsu M10-4S - Version All Versions to All Versions [Release All Releases]Information in this document applies to any platform. Goal CAP PROBLEM OVERVIEW: How to replace a XSCF Dual Cable from a BB to a BB SolutionDISPATCH INSTRUCTIONS WHAT SKILLS DOES THE ENGINEER NEED:(IS A SITE ENGINEER AVAILABLE?) Field training in M10-4S servers TASK COMPLEXITY: 2 Time Estimate: 30 minutes FIELD ENGINEER INSTRUCTIONS WHAT STATE SHOULD THE SYSTEM BE IN TO BE READY TO PERFORM THE RESOLUTION ACTIVITY?: While all types of maintenance are available for the XSCF Dual Cable from a BB to a BB replacement, the easiest is Active/hot maintenance.
1. Execute the XSCF> replacefru command to isolate the Standby BB unit 2. On the Standby BB remove the faulted XSCF Dual cable by pushing the lock release buttons on the both sides of the cable and disconnecting the cable. 3. Trace the cable to the Master XSCF and disconnect the cable from it 4. Install the replacement cable. 5. Execute the XSCF> replacefru command to restore the Standby BB to service
OBTAIN CUSTOMER ACCEPTANCE WHAT ACTION DOES THE CUSTOMER NEED TO TAKE TO RETURN THE SYSTEM TO AN OPERATIONAL STATE: Verify the status of all domains. PARTS NOTE: REFERENCE INFORMATION: Service Manual - http://docs.oracle.com/cd/E38160_01 Attachments This solution has no attachment |
||||||||||||||
|