Sun Microsystems, Inc.  Oracle System Handbook - ISO 7.0 May 2018 Internal/Partner Edition
   Home | Current Systems | Former STK Products | EOL Systems | Components | General Info | Search | Feedback

Asset ID: 1-71-1528951.1
Update Date:2016-08-01
Keywords:

Solution Type  Technical Instruction Sure

Solution  1528951.1 :   Fujitsu M10 PCI Expansion Unit: How to Remove and Replace a PCI Expansion Unit Management Cable  


Related Items
  • Fujitsu M10-1
  •  
  • Fujitsu M10-4S
  •  
  • Fujitsu M10 PCI Expansion Unit
  •  
  • Fujitsu M10-4
  •  
Related Categories
  • PLA-Support>Sun Systems>Sun_Other>Sun Collections>SN-OTH: SPARC-CAP VCAP
  •  




In this Document
Goal
Solution
References


Oracle Confidential INTERNAL - Do not distribute to customer (OracleConfidential).
Reason: FRU CAP

Applies to:

Fujitsu M10-1 - Version All Versions and later
Fujitsu M10-4S - Version All Versions and later
Fujitsu M10 PCI Expansion Unit - Version All Versions and later
Fujitsu M10-4 - Version All Versions and later
Information in this document applies to any platform.

Goal

How to remove and replace a PCI Expansion Unit Management cable

********************************************************************************
To report errors or request improvements on this procedure,
please go to http://support.us.oracle.com and put a comment on Doc ID:  1528951.1
********************************************************************************

 

Solution

DISPATCH INSTRUCTIONS

WHAT SKILLS DOES THE ENGINEER NEED:
Engineer should be M10 product trained

TASK COMPLEXITY: 2

TIME ESTIMATE: 30 minutes


FIELD ENGINEER INSTRUCTIONS

PROBLEM OVERVIEW:
A PCI Expansion Unit Management cable has Failed

WHAT STATE SHOULD THE SYSTEM BE IN TO BE READY TO PERFORM THE RESOLUTION ACTIVITY?

A data backup is not a pre-requisite

Before replacing the FRU make sure the Customer has done the Preliminary steps before FRU replacement in a PCI Expansion Unit: Doc Id. 1528544.1     

 

WHAT ACTION DOES THE ENGINEER NEED TO TAKE:


1.   Remove the Management cable which is the lowest cable on the Link Card
2.   Replace the Management cable



OBTAIN CUSTOMER ACCEPTANCE

WHAT ACTION DOES THE CUSTOMER NEED TO TAKE TO RETURN THE SYSTEM TO AN OPERATIONAL STATE:


The Customer needs to restore the system to service by following the steps in the Preliminary steps before FRU replacement in a PCI Expansion Unit: Doc Id. 1528544.1

PARTS NOTE:

REFERENCE INFORMATION:

Service Manual - http://docs.oracle.com/cd/E38160_01


Attachments
This solution has no attachment
  Copyright © 2018 Oracle, Inc.  All rights reserved.
 Feedback