Sun Microsystems, Inc.  Oracle System Handbook - ISO 7.0 May 2018 Internal/Partner Edition
   Home | Current Systems | Former STK Products | EOL Systems | Components | General Info | Search | Feedback

Asset ID: 1-71-1528949.1
Update Date:2016-08-01
Keywords:

Solution Type  Technical Instruction Sure

Solution  1528949.1 :   Fujitsu M10 PCI Expansion Unit - How to remove and replace a PCI Expansion Unit Link cable  


Related Items
  • Fujitsu M10-1
  •  
  • Fujitsu M10-4S
  •  
  • Fujitsu M10-4
  •  
  • Fujitsu M10 PCI Expansion Unit
  •  
Related Categories
  • PLA-Support>Sun Systems>Sun_Other>Sun Collections>SN-OTH: SPARC-CAP VCAP
  •  




In this Document
Goal
Fix
References


Oracle Confidential INTERNAL - Do not distribute to customer (OracleConfidential).
Reason: FRU CAP

Applies to:

Fujitsu M10-1 - Version All Versions and later
Fujitsu M10-4 - Version All Versions and later
Fujitsu M10-4S - Version All Versions and later
Fujitsu M10 PCI Expansion Unit - Version All Versions and later
Information in this document applies to any platform.

Goal

How to remove and replace a PCI Expansion Unit Link cable

********************************************************************************
To report errors or request improvements on this procedure,
please go to http://support.us.oracle.com and put a comment on Doc ID: 1528949.1
********************************************************************************

 

Fix

DISPATCH INSTRUCTIONS

WHAT SKILLS DOES THE ENGINEER NEED:
Engineer should be M10 product trained

TASK COMPLEXITY: 2

TIME ESTIMATE: 30 minutes


FIELD ENGINEER INSTRUCTIONS

PROBLEM OVERVIEW:
A PCI Expansion Unit Link cable has Failed

WHAT STATE SHOULD THE SYSTEM BE IN TO BE READY TO PERFORM THE RESOLUTION ACTIVITY?

A data backup is not a pre-requisite

Before replacing the FRU make sure the Customer has done the Preliminary steps before FRU replacement in a PCI Expansion Unit: Doc Id. 1528544.1     

 


WHAT ACTION DOES THE ENGINEER NEED TO TAKE:

Note Link Cables are replaced in pairs. The Link Cables are the top 2 cables on the Link Card.

1.   Remove the 2 Link Cables
2.   Replace the 2 Link Cables



OBTAIN CUSTOMER ACCEPTANCE

WHAT ACTION DOES THE CUSTOMER NEED TO TAKE TO RETURN THE SYSTEM TO AN OPERATIONAL STATE:


The Customer needs to restore the system to service by following the steps in the Preliminary steps before FRU replacement in a PCI Expansion Unit: Doc Id. 1528544.1

PARTS NOTE:

REFERENCE INFORMATION:

Service Manual - http://docs.oracle.com/cd/E38160_01

References


Attachments
This solution has no attachment
  Copyright © 2018 Oracle, Inc.  All rights reserved.
 Feedback