Sun Microsystems, Inc.  Oracle System Handbook - ISO 7.0 May 2018 Internal/Partner Edition
   Home | Current Systems | Former STK Products | EOL Systems | Components | General Info | Search | Feedback

Asset ID: 1-71-1528156.1
Update Date:2016-01-20
Keywords:

Solution Type  Technical Instruction Sure

Solution  1528156.1 :   Mx-32 - How to Replace a Faulty Power Signal Distribution Board (PSDB)  


Related Items
  • SPARC M5-32
  •  
  • SPARC M6-32
  •  
  • Oracle SuperCluster M6-32 Hardware
  •  
Related Categories
  • PLA-Support>Sun Systems>Sun_Other>Sun Collections>SN-OTH: SPARC-CAP VCAP
  •  




In this Document
Goal
Solution


Oracle Confidential INTERNAL - Do not distribute to customer (OracleConfidential).
Reason: FRU CAP

Applies to:

SPARC M5-32 - Version All Versions and later
SPARC M6-32 - Version All Versions and later
Oracle SuperCluster M6-32 Hardware - Version All Versions and later
Information in this document applies to any platform.

Goal

CAP PROBLEM OVERVIEW: Mx-32 -  Faulty Power Signal Distribution Board (PSDB)

 


To report errors or request improvements on this procedure, please go to My Oracle Support, and put a comment on Doc ID: 1528156.1


 

ESD Caution:
  • Circuit boards and drives contain electronic components that are  extremely sensitive to static electricity. Ordinary amounts of static electricity from clothing or the work environment can destroy the components located on these boards. Do not touch the components along their connector edges.
  • Use a Antistatic Wrist strap. Attach one end of the strap to your wrist and the other end to the chassis, depending on what type of strap you use, with the adhesive end or the metal plug.
  • Use an Antistatic Mat. Place ESD-sensitive components such as motherboards, memory, and other PCBs on an antistatic mat.

 

Contamination Caution:
  • Dust particles of packaging material are number one cause of datacenter contamination. Make sure to remove all packaging material, up to the ESD safe packaging material, while still being outside the datacenter.

Solution

DISPATCH INSTRUCTIONS

WHAT SKILLS DOES THE ENGINEER NEED:  Mx-32 Product Training/Experience

TASK COMPLEXITY: 1

TIME ESTIMATE: 120 minutes COLD replacement

FIELD ENGINEER INSTRUCTIONS

WHAT STATE SHOULD THE SYSTEM BE IN TO BE READY TO PERFORM THE RESOLUTION ACTIVITY? : The system needs to be powered off

WHAT ACTION DOES THE ENGINEER NEED TO TAKE:

1. Halt the server and turn off all AC power:

  • Turn the key switch on the Front Panel of the server to the Service position.
  • Gracefully shutdown the server by running the ILOM command "stop /System" (requires Oracle ILOM Reset and Host Control (r) user role).
  • Turn off all external breakers for the server.
  • For maximum safety, disconnect all six power cords from their respective AC outlets.

2. Verify that it is safe to remove the faulty Power Signal Distribution Board (PSDB):

  • All six external breakers for the server must be in the Off position.
  • All six power cords for this server must be unplugged from their respective AC outlets.
  • No LEDs on the server should be lighted.
  • You should not hear any fans running in the server.

3. Use a grounding strap to protect the equipment from ESD damage.

4. Locate the Faulty PSDB at the front of the chassis.

5. Remove the Faulty PSDB:

  • Use a T20 Torx screwdriver to loosen two captive screws.
  • Open the extraction levers fully to unseat the PSDB.
  • Pull the PSDB out of the cabinet.

6. Unpack the replacement PSDB from its ESD safe packaging.

7. Pack the faulty PSDB into its ESD safe packaging.

8. Install the replacement PSDB:

  • Open the extraction levers fully.
  • Insert the replacement PSDB until the extraction levers start to close.
  • Close the extraction levers to lock the PSDB in the slot.
  • Use a T20 Torx screwdriver to tighten the two captive screws.

9. Verify all six external breakers are still in the Off position.

10. Warn bystanders that you are preparing to restart the server.

11. Turn on all AC power and start the server:

  • Connect all six AC cords to their respective AC outlets.
  • Turn on all external breakers for the server.
  • Turn the key switch on the Front Panel of the server to the On position.
  • Start the server by running the ILOM command "start /System" (requires Oracle ILOM Reset and Host Control (r) user role).

12. Prepare the faulted Power Signal Distribution Board (PSDB) outside the datacenter for return to Oracle.

 

OBTAIN CUSTOMER ACCEPTANCE

WHAT ACTION DOES THE CUSTOMER NEED TO TAKE TO RETURN THE SYSTEM TO AN OPERATIONAL STATE:

Restart software applications per applicable administration guides to resume system operation.

 

======================== Other info =====================

REFERENCE INFORMATION:  Service Manual: https://www.oracle.com/technetwork/documentation/oracle-sparc-ent-servers-189996.html


Attachments
This solution has no attachment
  Copyright © 2018 Oracle, Inc.  All rights reserved.
 Feedback