![]() | Oracle System Handbook - ISO 7.0 May 2018 Internal/Partner Edition | ||
|
|
![]() |
||||||||||||||
Solution Type Technical Instruction Sure Solution 1527096.1 : How to Remove and Replace a Netra t 1120/1125 NVRAM:ATR:1527096.1:1
In this Document
Oracle Confidential INTERNAL - Do not distribute to customer (OracleConfidential). Applies to:Sun Netra T1120 Server - Version Not Applicable to Not Applicable [Release N/A]Sun Netra T1125 Server - Version Not Applicable to Not Applicable [Release N/A] Information in this document applies to any platform. GoalHow to Remove and Replace a Netra t 1120/1125 NVRAM ********************************************************************* FixDISPATCH INSTRUCTIONS WHAT SKILLS DOES THE FIELD ENGINEER/ADMINISTRATOR NEED?: Netra t 1120/1125 product training recommended, but not required. TIME ESTIMATE: 45 mins TASK COMPLEXITY: 1 FIELD ENGINEER/ADMINISTRATOR INSTRUCTIONS: PROBLEM OVERVIEW: NVRAM Failure WHAT STATE SHOULD THE SYSTEM BE IN TO BE READY TO PERFORM THE RESOLUTION ACTIVITY?: A data backup is not a pre-requisite but is a wise precaution. WHAT ACTION DOES THE FIELD ENGINEER/ADMINISTRATOR NEED TO TAKE?: NVRAM/TOD Note – The NVRAM/TOD contains the system host identification (ID) and Ethernet
To Remove the NVRAM/TOD Caution – Use proper ESD grounding techniques when handling components. Wear 1. Attach the wrist strap. 6. Grasp the NVRAM/TOD carrier at each end and pull straight up. Note – Gently rock the NVRAM/TOD from side to side as necessary. 7. Place the NVRAM/TOD and carrier on an ESD mat.
To Replace a NVRAM/TOD Caution – Use proper ESD grounding techniques when handling components. Wear 1. Attach the wrist strap. 3. Carefully insert the NVRAM/TOD and carrier into the socket. Note – The carrier is keyed so the NVRAM/TOD can only be installed one way 4. Push the NVRAM/TOD into the carrier until properly seated. 5. Replace the power supply. OBTAIN CUSTOMER ACCEPTANCE WHAT ACTION DOES THE FIELD ENGINEER/ADMINISTRATOR NEED TO TAKE TO Restart software applications per applicable administration guides to resume system operation. PARTS NOTE: https://support.us.oracle.com/handbook_internal/Systems/Netra_t_1120/Netra_t_1120.html https://support.oracle.com/handbook_private/Systems/Netra_t_1120/Netra_t_1120.html https://support.us.oracle.com/handbook_internal/Systems/Netra_t_1125/Netra_t_1125.html https://support.oracle.com/handbook_private/Systems/Netra_t_1125/Netra_t_1125.html REFERENCE INFORMATION: Netra t 1120/1125 Service Manual (805-6804-10): https://support.oracle.com/handbook_private/data/805/805-6804/pdf/ Attachments This solution has no attachment |
||||||||||||||
|