Sun Microsystems, Inc.  Oracle System Handbook - ISO 7.0 May 2018 Internal/Partner Edition
   Home | Current Systems | Former STK Products | EOL Systems | Components | General Info | Search | Feedback

Asset ID: 1-71-1507576.1
Update Date:2013-05-20
Keywords:

Solution Type  Technical Instruction Sure

Solution  1507576.1 :   SFP Replacement on a Brocade M4700 Fibre Channel (FC) Switch  


Related Items
  • McData Sphereon 4700 Fabric Switch
  •  
  • Brocade M4700 Switch
  •  
Related Categories
  • PLA-Support>Sun Systems>Sun_Other>Sun Collections>SN-OTH: DISK-CAP VCAP
  •  




In this Document
Goal
Solution


Applies to:

Brocade M4700 Switch - Version All Versions to All Versions [Release All Releases]
McData Sphereon 4700 Fabric Switch - Version Not Applicable to Not Applicable [Release N/A]
Information in this document applies to any platform.

Goal

 SFP Replacement on Fibre Channel (FC) Switch

Solution

DISPATCH INSTRUCTIONS

   WHAT SKILLS DOES THE FIELD ENGINEER/ADMINISTRATOR NEED?:

Need to be familiar with SFP hardware


   TIME ESTIMATE:  2 minutes

   TASK COMPLEXITY: 0


   REQUIRED TOOL: 5/16-inch door tool (If the switch is installed in an FC-512 Fabricenter equipment cabinet)



FIELD ENGINEER/ADMINISTRATOR INSTRUCTIONS

   PROBLEM OVERVIEW:

SFP Replacement on Fibre Channel Switch


   WHAT STATE SHOULD THE SYSTEM BE IN TO BE READY TO PERFORM THE RESOLUTION ACTIVITY?:

- Instruct the customer to block the port with the defective SFP. Ensure the system administrator sets any attached device offline.

- If the product is rack-mounted, perform one of the following:

If the product is installed in an FC-512 Fabricenter equipment cabinet, insert the 5/16-inch door tool into the socket hole at the right top of the door (front or rear). Turn the tool counter- clockwise to unlock and open the door.

If the product is installed in a customer-supplied equipment cabinet, unlock and open the cabinet door (front or rear) as directed by the customer representative.

 
   WHAT ACTION DOES THE FIELD ENGINEER/ADMINISTRATOR NEED TO TAKE?:

- Locate port that has defective SFP
- Make note or insure any cable in SFP is properly labeled for quick reconnect
- Ensure an ESD grounding cable is connected to the product chassis (or approved bench ground) and your wrist.
- Disconnect cable from SFP
- Disengage the locking mechanism by rotating the wire bale (wire handle) up or down 90 degrees
- Remove defective SFP by pulling the bail (wire handle), sliding the transceiver out of the switch or blade
- With bail (wire handle) out, position replacement SFP in the port and insert it into a port until it is firmly seated, then engage the locking mechanism by rotating the wire bale up or down 90 degrees
- Re-connect cable into SFP


OBTAIN CUSTOMER ACCEPTANCE

   WHAT ACTION DOES THE FIELD ENGINEER/ADMINISTRATOR NEED TO TAKE TO RETURN THE SYSTEM TO AN OPERATIONAL STATE?:

- Instruct the customer to un-block the port with the replacemnet SFP.
- If necessary, close and lock the equipment cabinet door.


PARTS NOTE:  None


REFERENCE INFORMATION:  None

 

 


Attachments
This solution has no attachment
  Copyright © 2018 Oracle, Inc.  All rights reserved.
 Feedback