![]() | Oracle System Handbook - ISO 7.0 May 2018 Internal/Partner Edition | ||
|
|
![]() |
||||||||||||||
Solution Type Technical Instruction Sure Solution 1497631.1 : How to remove and replace a Starcat MCPU / SLOT 1 dual socket CPU board.
In this Document
Oracle Confidential (INTERNAL). Do not distribute to customers. Applies to:Sun Fire 12K Server - Version Not Applicable and laterSun Fire E20K Server - Version Not Applicable and later Sun Fire E25K Server - Version Not Applicable and later Sun Fire 15K Server - Version Not Applicable and later Information in this document applies to any platform. GoalHow to remove and replace a Starcat MCPU / SLOT 1 dual socket CPU board. ******************************************************************************** To report errors or request improvements on this procedure, please go to http://support.us.oracle.com and put a comment on Doc ID: ******************************************************************************** FixCAP PROBLEM OVERVIEW: Slot 1 MCPU Board needs replacement DISPATCH INSTRUCTIONS WHAT SKILLS DOES THE ENGINEER NEED:(IS A SITE ENGINEER AVAILABLE?) Starcat Training, Familiarity with SMS command set. TIME ESTIMATE: 45 minutes TASK COMPLEXITY: 2 FIELD ENGINEER INSTRUCTIONS MCPU Board hosts the physical dual core MCPU Board, MaxCPU (18 ea)(into Expander, bottom) MCPU IO0 thru IO17 DR (Dynamic Reconfiguration) OR a domain outage will be required. WHAT STATE SHOULD THE SYSTEM BE IN TO BE READY TO PERFORM THE RESOLUTION ACTIVITY? : The customer should DR the MCPU board out of the domain. The AP_ID for MCPU is the IO slot, i.e. "cfgadm -c disconnect IOx". Then power off the MCPU board. If DR is not possible, the customer can shut the domain down using "setkeyswitch -d X off". WHAT ACTION DOES THE ENGINEER NEED TO TAKE: 1: Note the positions of any cabling going into the PCI cards (SCSI, network, fibre, etc). Ensure each cable is labelled. Remove the cables. 2: Note the positions of any PCI cassettes. Remove each PCI cassette from the IO board to be replaced. 3: Remove the IO board 4: IMPORTANT: On the MAIN SC, wait for $SMSLOGGER/platform/messages to show a message stating that the board has been removed. 5: Insert replacement IO board 6: Perform level 32 POST using "setkeyswitch -d X -l 32 on" OBTAIN CUSTOMER ACCEPTANCE N/A WHAT ACTION DOES THE CUSTOMER NEED TO TAKE TO RETURN THE SYSTEM TO AN OPERATIONAL STATE: N/A REFERENCE INFORMATION: Service Manual: http://download.oracle.com/docs/cd/E19065-01/servers.e25k/index.html TIME ESTIMATE: 45 minutes Inclusive of POST. Attachments This solution has no attachment |
||||||||||||||
|