Solution  1488814.1 :   How to Remove and Replace a Sun Ultra 25/Ultra 45 Workstation Power Supply:ATR:1488814.1:1  


Related Items
  • Sun Ultra 45 Workstation
  •  
  • Sun Ultra 25 Workstation
  •  
Related Categories
  • PLA-Support>Sun Systems>Sun_Other>Sun Collections>SN-OTH: SPARC-CAP VCAP
  •  




In this Document
Goal
Fix
 Replacing the Power Supply
 Removing the Power Supply
 Installing the Power Supply


Oracle Confidential (INTERNAL). Do not distribute to customers.
Reason: Power Supply is a FRU as per SSH

Applies to:

Sun Ultra 25 Workstation - Version Not Applicable to Not Applicable [Release N/A]
Sun Ultra 45 Workstation - Version Not Applicable to Not Applicable [Release N/A]
Information in this document applies to any platform.

Goal

 Sun Ultra 25/Ultra 45 Workstation - How to Remove and Replace a Sun Ultra 25 Workstation Power Supply

Fix

 DISPATCH INSTRUCTIONS
   WHAT SKILLS DOES THE FIELD ENGINEER/ADMINISTRATOR NEED?:

Sun Ultra 25/Ultra 45 Workstation  product training is desirable but not required

   TIME ESTIMATE: 60 mins

   TASK COMPLEXITY: 1

FIELD ENGINEER/ADMINISTRATOR INSTRUCTIONS:
   PROBLEM OVERVIEW: Faulty Power Supply

   WHAT STATE SHOULD THE SYSTEM BE IN TO BE READY TO PERFORM THE RESOLUTION ACTIVITY?:

A data backup is not a pre-requisite but is a wise precaution.
The customer should conduct an orderly software system shutdown.

   WHAT ACTION DOES THE FIELD ENGINEER/ADMINISTRATOR NEED TO TAKE?:

Replacing the Power Supply

This section describes removal and installation of the power supply.

Removing the Power Supply

1. Power off the system and attach an antistatic wrist strap. Open and position the chassis, and remove the access panel.

2. If necessary, remove any long PCI cards that are blocking the cables.

 - Place the PCI card on an antistatic mat.

3. Remove the fan tray.

4. Squeeze the power supply connector clip to disconnect the following cables from the motherboard:

 - P2 power cable on the motherboard (J22)

 - P1 power cable on the motherboard at (J28)

 - P5 power supply signal cable on the motherboard (J45)

5. Disconnect the following cables from the hard drive backplane:

 - P3 hard drive backplane power cable on the hard drive backplane (J2)

 - Hard drive signal cable to J4 on the hard drive backplane. (This cable also serves as a cable clip over other cables).

6. Turn the captive screw that secures the power supply to the chassis

7. Using the handle, push the power supply out of the back of the chassis.

8.  Guide the power cables out of the chassis as you push the power supply out the back of the chassis.

 - Set the power supply aside on an antistatic mat.

Installing the Power Supply

1. Remove the new power supply from its package.

2. Align the power supply IEC-320 connector so that the power cord socket is nearest the left rear of the chassis, when viewed from the back.

3. Guide the cables and push the power supply into the chassis opening until the back of the power supply aligns with the back of the chassis.

4. Tighten the captive screw that secures the power supply to the chassis.

5. Connect the following cables:

 - P1 power cable on the motherboard at (J28)

 - P2 power cable on the motherboard (J22)

 - P3 hard drive backplane power cable on the hard drive backplane (J2)

 - P5 power supply signal cable on the motherboard (J45) 

 - Hard drive signal cable to J4 on the hard drive backplane. (This cable also serves as a cable clip over other cables).

6. Inspect the power supply fasteners to verify that:

  - The power supply push bar is seated.

 - The power supply captive screw is tight.

7. Inspect the power supply cabling to verify that:

 - The three power supply cables are firmly connected to the motherboard at P1, P2, and P5 (J45).

 - The hard drive backplane power cable is firmly connected at J4.

 - The hard drive backplane signal cable is securely connected at both ends and is routed over the other cables.

8. Install the fan tray.

9. If you removed any PCI cards, re-install them.

10. Reasemble the workstation. Power on the system, and verify the power supply installation.

OBTAIN CUSTOMER ACCEPTANCE
   WHAT ACTION DOES THE FIELD ENGINEER/ADMINISTRATOR NEED TO TAKE TO RETURN THE SYSTEM TO AN OPERATIONAL STATE?:

Restart software applications per applicable administration guides to resume system operation.

PARTS NOTE:

https://support.oracle.com/handbook_private/Systems/Ultra25/components.html

https://support.oracle.com/handbook_private/Systems/Ultra45/components.html

REFERENCE INFORMATION:

Please refer to the Sun Ultra 25/Ultra 45 Workstation Service and Diagnostics Manual: http://docs.oracle.com/cd/E19127-01/ultra25.ws/819-1892-12/819-1892-12.pdf