![]() | Oracle System Handbook - ISO 7.0 May 2018 Internal/Partner Edition | ||
|
|
![]() |
||||||||||||||||||
Solution Type Technical Instruction Sure Solution 1488773.1 : How to Remove and Replace a Sun Ultra 25/Ultra 45 Workstation NVRAM:ATR:1488773.1:1
In this Document
Oracle Confidential PARTNER - Available to partners (SUN). Applies to:Sun Ultra 25 Workstation - Version Not Applicable to Not Applicable [Release N/A]Sun Ultra 45 Workstation - Version Not Applicable to Not Applicable [Release N/A] Information in this document applies to any platform. GoalSun Ultra 25/Ultra 45 Workstation - How to Remove and Replace a Sun Ultra 25 Workstation NVRAM Solution DISPATCH INSTRUCTIONS Sun Ultra 25/Ultra 45 Workstation product training is desirable but not required. TIME ESTIMATE: 45 mins TASK COMPLEXITY: 1 WHAT STATE SHOULD THE SYSTEM BE IN TO BE READY TO PERFORM THE RESOLUTION ACTIVITY?: A data backup is not a pre-requisite but is a wise precaution. WHAT ACTION DOES THE FIELD ENGINEER/ADMINISTRATOR NEED TO TAKE?: Replacing the NVRAM (nonvolatile random access memory) Note - If you are replacing a motherboard and you have software that is licensed to the HostID or Ethernet address, you should install the old NVRAM on the new motherboard. Removing the NVRAM1. Power off the system and attach an antistatic wrist strap. Open and position the chassis, and remove the access panel. 2. Locate the NVRAM on the Motherboard 3. Pull the NVRAM straight up from the motherboard connector 4. Set the NVRAM aside on an antistatic mat. Note – NVRAM and the NVRAM connector are keyed. Installing the NVRAMThe NVRAM installs directly onto the motherboard. There are no additional fasteners or cables. 1. Power off the system and attach an antistatic wrist strap. Open and position the chassis, and remove the access panel. 2. Align the NVRAM key to the NVRAM connector key on the motherboard. Note – NVRAM and the NVRAM connector are keyed. 3. Press the NVRAM down into the connector. 4. Ensure that the NVRAM is tight in its connector. 5. If you are finished working, reassemble the workstation, power on the workstation, and verify the NVRAM installation. OBTAIN CUSTOMER ACCEPTANCE Restart software applications per applicable administration guides to resume system operation. PARTS NOTE: https://support.oracle.com/handbook_private/Systems/Ultra25/components.html https://support.us.oracle.com/handbook_internal/Systems/Ultra45/components.html (Note - NVRAM is listed as IDPROM in the SSH for the Ultra 25/Ultra 45 Workstation). This part is not a FRU or CRU part, however, it could be replaced by a FE onsite. Please see the note in the SSH: How To article 1006941.1 for instructions on ordering replacement Socketed System Configuration Chip (SSCC NVRAM). REFERENCE INFORMATION: Please refer to the Sun Ultra 25/Ultra 45 Workstation Service and Diagnostics Manual: http://docs.oracle.com/cd/E19127-01/ultra25.ws/819-1892-12/819-1892-12.pdf
Attachments This solution has no attachment |
||||||||||||||||||
|