Solution Type Technical Instruction Sure Solution 1488325.1 : How to Remove and Replace Sun Blade 2500 Power Supply:ATR:1488325.1:1
In this Document
Oracle Confidential (INTERNAL). Do not distribute to customers. Applies to:Sun Blade 2500 Workstation - Version Not Applicable to Not Applicable [Release N/A]Sun Blade 2500 Silver (1.6 Ghz) Workstation - Version Not Applicable to Not Applicable [Release N/A] Information in this document applies to any platform. GoalHow to Remove and Replace Sun Blade 2500 Power Supply Fix
DISPATCH INSTRUCTIONS OBTAIN CUSTOMER ACCEPTANCE WHAT STATE SHOULD THE SYSTEM BE IN TO BE READY TO PERFORM THE RESOLUTION ACTIVITY? : A data backup is not a pre-requisite but is a wise precaution. WHAT ACTION DOES THE FIELD ENGINEER/CUSTOMER ADMINISTRATOR NEED TO TAKE: Removing the Power Supply 1.Power off the system, and open and position the chassis. 4.Remove the hard drive assembly. 8.Disconnect the two power supply cables from motherboard at PS1 and PS2. 9.If necessary, open the cable routing clips and remove the power cable(s) from the clip(s). 10.Using a No. 2 Phillips screwdriver, remove the three external screws that secure the power supply to the chassis. 11.Using a No. 2 Phillips screwdriver, remove both screws that secure the power supply to the system chassis top. 12.Shift the power supply toward the front of the chassis, lift it up and out of the chassis.
Installing the Power Supply 1.Remove the new power supply from its packaging. 4.Using a No. 2 Phillips screwdriver, replace the internal screws that secure the power supply to the chassis. 5.Using a No. 2 Phillips screwdriver, install the three external screws that secure the power supply to the chassis rear panel. 6.Connect power supply connectors PS1 and PS2 to the motherboard connectors PS1 and PS2. 7.Connect power supply and cable connector P5 to the SCSI backplane. 8.Install the power cable into the two routing clips on the bottom and back of the hard drive assembly. 9..Install the hard drive assembly. 12.Install the access panel, power on the system, and verify the component installation.
WHAT ACTION DOES THE CUSTOMER NEED TO TAKE TO RETURN the SYSTEM TO AN OPERATIONAL STATE:
https://support.oracle.com/handbook_private/Systems/SunBlade2500/components.html https://support.oracle.com/handbook_private/Systems/SunBlade2500S/components.html
ADDITIONAL COMMENTS: Sun Blade 2500 Service, Diagnostics, and Troubleshooting Manual (Silver): http://docs.oracle.com/cd/E19127-01/blade2500.ws/817-5117-11/817-5117-11.pdf Sun Blade 2500 Service, Diagnostics, and Troubleshooting Manual (Red): http://docs.oracle.com/cd/E19127-01/blade2500.ws/816-0996-11/816-0996-11.pdf Attachments This solution has no attachment |
||||||||||||||
|