Sun Microsystems, Inc.  Oracle System Handbook - ISO 7.0 May 2018 Internal/Partner Edition
   Home | Current Systems | Former STK Products | EOL Systems | Components | General Info | Search | Feedback

Asset ID: 1-71-1487899.1
Update Date:2017-11-30
Keywords:

Solution Type  Technical Instruction Sure

Solution  1487899.1 :   How to Remove and Replace Sun Blade 1500 Silver/2500 NVRAM:ATR:1487899.1:1  


Related Items
  • Sun Blade 1500 Workstation
  •  
  • Sun Blade 2500 Workstation
  •  
  • Sun Blade 2500 Silver (1.6 Ghz) Workstation
  •  
Related Categories
  • PLA-Support>Sun Systems>Sun_Other>Sun Collections>SN-OTH: SPARC-CAP VCAP
  •  




In this Document
Goal
Fix


Oracle Confidential (INTERNAL). Do not distribute to customers.
Reason: it is a FRU part

Applies to:

Sun Blade 2500 Silver (1.6 Ghz) Workstation - Version Not Applicable to Not Applicable [Release N/A]
Sun Blade 2500 Workstation - Version Not Applicable to Not Applicable [Release N/A]
Sun Blade 1500 Workstation - Version Not Applicable to Not Applicable [Release N/A]
Information in this document applies to any platform.

Goal

    Sun Blade 1500 Silver/2500, How to Remove and Replace NVRAM

Fix

 

DISPATCH INSTRUCTIONS

WHAT SKILLS DOES THE FIELD ENGINEER/ADMINISTRATOR NEED:
Sun Blade 1500 Silver/2500 product training is desirable but not required

TASK COMPLEXITY: 1

TIME ESTIMATE: 45 minutes

FIELD ENGINEER INSTRUCTIONS

PROBLEM OVERVIEW: NVRAM failure

OBTAIN CUSTOMER ACCEPTANCE

WHAT STATE SHOULD THE SYSTEM BE IN TO BE READY TO PERFORM THE RESOLUTION ACTIVITY? :

A data backup is not a pre-requisite but is a wise precaution.
The customer should conduct an orderly software system shutdown.

WHAT ACTION DOES THE FIELD ENGINEER/CUSTOMER ADMINISTRATOR NEED TO TAKE:

Removing the NVRAM

1.Power off the system, then open and position the chassis.

2.Locate the NVRAM.

3.Pull the NVRAM straight up from the connector.

Note – NVRAM and the NVRAM connector are keyed.
The workstation does not function without NVRAM.

Installing the NVRAM

NVRAM installs directly onto the motherboard. There are no additional fasteners or cables.

1.Locate the NVRAM connector.

2.Align the NVRAM key to the NVRAM connector key on the motherboard.

Note – NVRAM and the NVRAM connector are keyed.

3.Press the NVRAM down until snug.

4.Ensure that the NVRAM is tight in its connector.

5.Reposition the chassis, replace the access panel, power on the system, and verify the component installation.

 

WHAT ACTION DOES THE CUSTOMER NEED TO TAKE TO RETURN the SYSTEM TO AN OPERATIONAL STATE:

Restart software applications per applicable administration guides to resume system operation.



PARTS NOTE: Include NVRAM location:

https://support.oracle.com/handbook_private/Systems/SunBlade2500/components.html#SystemBoard

https://support.oracle.com/handbook_private/Systems/SunBlade2500S/components.html#SystemBoard

https://support.oracle.com/handbook_private/Systems/SunBlade1500S/components.html#IDPROM

 

ADDITIONAL COMMENTS:

Please refer to the

Sun Blade 2500 Service, Diagnostics, and Troubleshooting Manual (Silver): http://docs.oracle.com/cd/E19127-01/blade2500.ws/817-5117-11/817-5117-11.pdf

Sun Blade 2500 Service, Diagnostics, and Troubleshooting Manual (Red): http://docs.oracle.com/cd/E19127-01/blade2500.ws/816-0996-11/816-0996-11.pdf

Sun Blade 1500 Service, Diagnostics, and Troubleshooting Manual (Silver): http://docs.oracle.com/cd/E19127-01/blade1500.ws/817-5127-11/817-5127-11.pdf

 


Attachments
This solution has no attachment
  Copyright © 2018 Oracle, Inc.  All rights reserved.
 Feedback