![]() | Oracle System Handbook - ISO 7.0 May 2018 Internal/Partner Edition | ||
|
|
![]() |
||||||||||||||||
Solution Type Technical Instruction Sure Solution 1487331.1 : SL3000 - How to Remove / Replace AC/DC +5 Volt Power Supply in SL3000 Library:1487331.1:2
In this Document
Oracle Confidential PARTNER - Available to partners (SUN). Applies to:Sun StorageTek SL3000 Modular Library System - Version Not Applicable and laterInformation in this document applies to any platform. GoalHow to Remove / Replace AC/DC +5 Volt Power Supply in SL3000 Library. These power supplies, located below the HBT cards, are numbered as listed in Table 1-5 of the Service Manual. SolutionDISPATCH INSTRUCTIONS WHAT SKILLS DOES THE FIELD ENGINEER/ADMINISTRATOR NEED?: CSE must be familar with SL3000 hardware. TIME ESTIMATE: 30 minutes TASK COMPLEXITY: 2 FIELD ENGINEER/ADMINISTRATOR INSTRUCTIONS: PROBLEM OVERVIEW: 5 volt power supply has been determined to be defective and requires replacement. WHAT STATE SHOULD THE SYSTEM BE IN TO BE READY TO PERFORM THE RESOLUTION ACTIVITY?: This power supply is hot swappable and does not require operator intervention. WHAT ACTION DOES THE FIELD ENGINEER/ADMINISTRATOR NEED TO TAKE?: Refer to the SL3000 Service Manual for complete instructions on power supply replacement. This will have notes, warnings, and pictures to assist in the procedure. Tools needed for this procedure: Small Phillips secewdriver, ESD protection. Refer to this KB for location of failed power supply: SL3000 - Power Supply Locations for BDM and DEM (Doc ID 2180266.1) To remove this power supply: 1. Using a Phillips screwdriver, remove the left screw from the defective supply. 2. Using a Phillips screwdriver, loosen the captive screw within the release lever. 3. Using the card lever, remove the supply. To replace this power supply: 1. Using the card lever, insert and lock the new supply. 2. Using a Phillips screwdriver, insert and tighten the left screw. 3. Using a Phillips screwdriver, tighten the captive screw within the release lever. OBTAIN CUSTOMER ACCEPTANCE WHAT ACTION DOES THE FIELD ENGINEER/ADMINISTRATOR NEED TO TAKE TO RETURN THE SYSTEM TO AN OPERATIONAL STATE: Verify the Green LED is lit and the power supply status is good from the SL3000 Op Panel. NOTE: If the new power supply has an amber fault light, check if the ECM circuit breaker is tripped. PARTS NOTE: Sun StorageTek SL3000 Modular Library System - Full Components List, https://mosemp.us.oracle.com/handbook_internal/Systems/SL3000/components.html Search - " 314343901 [F] Card Cage Power Supply,AC/DC,200W " REFERENCE INFORMATION: SL3000 Service Manual, http://amomv0115.us.oracle.com/archive/cd_ns/E22211_16/index.html Search - "EM Power Supply:"
Attachments This solution has no attachment |
||||||||||||||||
|