Sun Microsystems, Inc.  Oracle System Handbook - ISO 7.0 May 2018 Internal/Partner Edition
   Home | Current Systems | Former STK Products | EOL Systems | Components | General Info | Search | Feedback

Asset ID: 1-71-1464601.1
Update Date:2016-03-11
Keywords:

Solution Type  Technical Instruction Sure

Solution  1464601.1 :   How to Replace a Netra T5220 Alarm Card:ATR:1464601.1:0  


Related Items
  • Sun Netra T5220 Server
  •  
Related Categories
  • PLA-Support>Sun Systems>Sun_Other>Sun Collections>SN-OTH: SPARC-CAP VCAP
  •  




Applies to:

Sun Netra T5220 Server - Version All Versions and later
Information in this document applies to any platform.

Goal

How to Replace a Netra T5220 Alarm card

***************************************************************************************
To report errors or request improvements on this procedure, please Add a Comment on Doc ID: 1464601.1
***************************************************************************************

Solution

DISPATCH INSTRUCTIONS


WHAT SKILLS ARE REQUIRED?: No special skills required, Customer Replaceable Unit (CRU) procedure

TIME ESTIMATE: 60 minutes

Task Complexity: 0

REMOVAL/REPLACEMENT INSTRUCTIONS:

PROBLEM OVERVIEW: Faulty Alarm Card

WHAT STATE SHOULD THE SYSTEM BE IN TO BE READY TO PERFORM THE RESOLUTION ACTIVITY? :
A data backup is not a pre-requisite but is a wise precaution.
Customer should shut the operating system down gracefully (using "init 0"), and after the system has shut down Switch from the system console to the -> prompt by typing the #. (Hash Period) key sequence. At the -> prompt, type the stop /SYS command.

WHAT ACTIONS ARE REQUIRED?:
*** Follow standard ESD procedures to avoid Electrostatic Discharge
1. Disconnect all power cables
2. Remove the Top Cover

Removal of Alarm Card:

1. Remove the PCI Mezzanine.
2. Disconnect the cables from the alarm board.
3. Remove the four alarm board screws and lift it up and out of the chassis

Installation of FT0:
1. Seat the alarm board back into the chassis, and tighten the four alarm board screws.
2. Reconnect the alarm board cables
3. Route the cables into the cable guides.
4. Install the PCI Mezzanine


Completion of replacement:
1. Install Top Cover.
2. Connect all power cables.

OBTAIN CUSTOMER ACCEPTANCE

WHAT ACTIONS ARE REQUIRED TO RETURN THE SYSTEM TO AN OPERATIONAL STATE?:
Customer restart software applications per applicable administration guides to resume system operation.

PARTS NOTE:  https://support.oracle.com/handbook_private/Systems/Netra_T5220/components.html#exploded_view

REFERENCE INFORMATION:   http://docs.oracle.com/cd/E19350-01/index.html


Attachments
This solution has no attachment
  Copyright © 2018 Oracle, Inc.  All rights reserved.
 Feedback