Asset ID: |
1-71-1462987.1 |
Update Date: | 2016-03-14 |
Keywords: | |
Solution Type
Technical Instruction Sure
Solution
1462987.1
:
How to Replace a Netra T5440 Battery Module:ATR:1462987.1:0
Related Categories |
- PLA-Support>Sun Systems>Sun_Other>Sun Collections>SN-OTH: SPARC-CAP VCAP
|
Applies to:
Sun Netra T5440 Server - Version All Versions and later
Information in this document applies to any platform.
Goal
How to replace a Netra T5440 Battery Module
***************************************************************************************
To report errors or request improvements on this procedure, please Add a Comment on Doc ID: 1462987.1
***************************************************************************************
Solution
DISPATCH INSTRUCTIONS
WHAT SKILLS ARE REQUIRED?: No special skills required, Customer Replaceable Unit (CRU) procedure
TIME ESTIMATE: 30 minutes
Task Complexity: 0
REMOVAL/REPLACEMENT INSTRUCTIONS:
PROBLEM OVERVIEW: Defective battery module
WHAT STATE SHOULD THE SYSTEM BE IN TO BE READY TO PERFORM THE RESOLUTION ACTIVITY?
A data backup is not a pre-requisite but is a wise precaution.
System needs to be shutdown by customer
WHAT ACTIONS ARE REQUIRED?:
*** Follow standard ESD procedures to avoid Electrostatic Discharge
A) Remove Battery
1. Remove the Top Cover
2. Remove the PCI Mezzanine Assembly
3. Gently depress the release tab and pull the battery out of the battery housing
B) Install Battery
1. Carefully press the new battery in the slot
2. Install the PCI Mezzanine Assembly
3. Install the Top Cover
OBTAIN CUSTOMER ACCEPTANCE:
WHAT ACTIONS ARE REQUIRED TO RETURN THE SYSTEM TO AN OPERATIONAL STATE?:
Verify functionality, no service LEDs or messages.
PARTS NOTES: https://support.oracle.com/handbook_private/Systems/Netra_T5440/components.html#SystemBoard
REFERENCE INFORMATION: http://docs.oracle.com/cd/E19874-01/index.html
Attachments
This solution has no attachment