Sun Microsystems, Inc.  Oracle System Handbook - ISO 7.0 May 2018 Internal/Partner Edition
   Home | Current Systems | Former STK Products | EOL Systems | Components | General Info | Search | Feedback

Asset ID: 1-71-1462974.1
Update Date:2016-03-14
Keywords:

Solution Type  Technical Instruction Sure

Solution  1462974.1 :   How to Replace a Netra T5440 Power Supply:ATR:1462974.1:0  


Related Items
  • Sun Netra T5440 Server
  •  
Related Categories
  • PLA-Support>Sun Systems>Sun_Other>Sun Collections>SN-OTH: SPARC-CAP VCAP
  •  




Applies to:

Sun Netra T5440 Server - Version All Versions and later
Information in this document applies to any platform.

Goal

How to replace a Netra T5440 Power Suppy

***************************************************************************************
To report errors or request improvements on this procedure, please Add a Comment on Doc ID: 1462974.1
***************************************************************************************

Solution

DISPATCH INSTRUCTIONS

WHAT SKILLS ARE REQUIRED?: No special skills required, Customer Replaceable Unit (CRU) procedure

TIME ESTIMATE: 30 minutes

Task Complexity: 0

REMOVAL/REPLACEMENT INSTRUCTIONS:

PROBLEM OVERVIEW: Failed Power Supply

WHAT STATE SHOULD THE SYSTEM BE IN TO BE READY TO PERFORM THE RESOLUTION ACTIVITY? :
Hot swappable component normal system recovery protection recommended.

WHAT ACTIONS ARE REQUIRED?:

Follow standard ESD precautions

A) Remove PSU:

1. Disconnect the power cord from the faulty power supply.

2. Grasp the power supply handle and push the power supply latch to the left while pushing inward on the power supply.

3. Pull the power supply out of the chassis


B) Install PSU:

1. Align the replacement power supply with the empty power supply chassis bay.

2. Slide the power supply into the bay until it is fully seated

3. Reconnect the power cord to the power supply.  Verify that the Input Power OK LED is lit.  If the system is in operation, the Output On LED should also be lit.

4. On the replaced power supply, verify that the amber Fault LED is not lit.


OBTAIN CUSTOMER ACCEPTANCE

WHAT ACTIONS ARE REQUIRED TO RETURN THE SYSTEM TO AN OPERATIONAL STATE?:

1. Verify that the System Power Supply Fault LED and the Service Required LED is not lit on the front and rear panels of the server.

2. At the ILOM -> prompt, issue the show faulty command to verify the status of the power supplies.



PARTS NOTE:  https://support.oracle.com/handbook_private/Systems/Netra_T5440/components.html#Power

REFERENCE INFORMATION:   http://docs.oracle.com/cd/E19874-01/index.html


Attachments
This solution has no attachment
  Copyright © 2018 Oracle, Inc.  All rights reserved.
 Feedback