Sun Microsystems, Inc.  Oracle System Handbook - ISO 7.0 May 2018 Internal/Partner Edition
   Home | Current Systems | Former STK Products | EOL Systems | Components | General Info | Search | Feedback

Asset ID: 1-71-1462365.1
Update Date:2016-03-07
Keywords:

Solution Type  Technical Instruction Sure

Solution  1462365.1 :   How to Remove and Replace a SPARC T6320 System Battery:ATR:1462365.1:0  


Related Items
  • Sun Blade T6320 Server Module
  •  
  • Sun Blade 6048 System
  •  
  • Sun Blade 6000 System
  •  
Related Categories
  • PLA-Support>Sun Systems>Sun_Other>Sun Collections>SN-OTH: SPARC-CAP VCAP
  •  




In this Document
Goal
Solution


Applies to:

Sun Blade 6000 System - Version All Versions and later
Sun Blade 6048 System - Version All Versions and later
Sun Blade T6320 Server Module - Version All Versions and later
Information in this document applies to any platform.

Goal

How to Remove and Replace a SPARC T6320 System Battery

********************************************************************************
To report errors or request improvements on this procedure,
please Add a Comment on Doc ID: 1462365.1
********************************************************************************

Solution

 

DISPATCH INSTRUCTIONS

This Action Plan requires the use of a coin cell battery which the FE will usually supply. In some instances, the FE may contact dispatch to request that the battery be ordered.

FE INSTRUCTIONS

This action plan requires the use of a coin cell battery. The coin cell battery should be retrieved from your personal stock of coin cell batteries. If you cannot readily obtain the correct quantity of these batteries, please contact dispatch to arrange for order.



WHAT SKILLS ARE REQUIRED
No special skills required, Customer Replaceable Unit (CRU) procedure

TIME ESTIMATE: 30 minutes

TASK COMPLEXITY: 0

REMOVAL/REPLACEMENT INSTRUCTIONS

PROBLEM OVERVIEW: failed T6320 system battery

WHAT STATE SHOULD THE SYSTEM BE IN TO BE READY TO PERFORM THE RESOLUTION ACTIVITY? :

Prepare for service by performing the following tasks:

    Shut Down the Oracle Solaris OS
    Prepare the Server Module for Removal
    Remove the Server Module From the Modular System
    Remove the Cover
    ESD Safety Measures


WHAT ACTIONS ARE REQUIRED:

1. Remove the service processor from the server module.

2. Carefully remove the battery from the service processor.

3. Install the replacement battery with the positive side (+) facing upward (away from the card).

4. Replace the service processor.

5. Return the server module to operation.

6. Use an Oracle ILOM command to set the clock’s day and time.

For example:

-> set /SP/clock datetime=061716192012
-> show /SP/clock

OBTAIN CUSTOMER ACCEPTANCE

WHAT ACTIONS ARE REQUIRED TO RETURN THE SYSTEM TO AN OPERATIONAL STATE:
Boot system and monitor boot sequence for errors. Test functionality of system:
1. Run the Solaris "fmadm faulty" and SP/ILOM "show faulty" command (if only ALOM is supported run "showfaults -v" command) to verify that the fault has been cleared.
2. Perform one of the following tasks based on your verification results:
   * If the previous steps did not clear the fault, refer to doc 1004229.1 for information about the tools and methods you can use to diagnose and clear
     component faults.
   * If the previous steps indicate that no faults have been detected, the component has been replaced successfully. No further action is required
3. Restart software applications per applicable administration guides to resume system operation.



PARTS NOTE:

https://support.oracle.com/handbook_private/Systems/SunBladeT6320/components.html#SystemServiceProcessor


REFERENCE INFORMATION:

SPARC T6320 Server Module Service Manual at http://docs.oracle.com/cd/E19745-01/820-2386-12/index.html


Attachments
This solution has no attachment
  Copyright © 2018 Oracle, Inc.  All rights reserved.
 Feedback