Sun Microsystems, Inc.  Oracle System Handbook - ISO 7.0 May 2018 Internal/Partner Edition
   Home | Current Systems | Former STK Products | EOL Systems | Components | General Info | Search | Feedback

Asset ID: 1-71-1460156.1
Update Date:2017-11-30
Keywords:

Solution Type  Technical Instruction Sure

Solution  1460156.1 :   How to Replace a Front Bezel Assembly in Netra 240:ATR:1460156.1:0  


Related Items
  • Sun Netra 240 (DC) Server
  •  
  • Sun Netra 240 (AC) Server
  •  
Related Categories
  • PLA-Support>Sun Systems>Sun_Other>Sun Collections>SN-OTH: SPARC-CAP VCAP
  •  




In this Document
Goal
Solution


Applies to:

Sun Netra 240 (AC) Server - Version Not Applicable and later
Sun Netra 240 (DC) Server - Version Not Applicable and later
Information in this document applies to any platform.

Goal

 Netra 240, How To Replace a Front Bezel Assembly

Solution

DISPATCH INSTRUCTIONS

WHAT SKILLS ARE REQUIRED:
No special skills required, Customer Replaceable Unit (CRU) procedure

TASK COMPLEXITY: 0

TIME ESTIMATE: 40 minutes

REMOVAL/REPLACEMENT INSTRUCTIONS

PROBLEM OVERVIEW: Front Bezel Assembly

OBTAIN CUSTOMER ACCEPTANCE

WHAT STATE SHOULD THE SYSTEM BE IN TO BE READY TO PERFORM THE RESOLUTION ACTIVITY? :

A data backup is not a pre-requisite but is a wise precaution.
The customer should conduct an orderly software system shutdown.

WHAT ACTIONS ARE REQUIRED:

The bezel assembly includes the bezel, the server status indicator board, the alarm LEDs, and the hinges. The assembly is replaced as a single unit.


Removing the Bezel Assembly


1.Power off the server.

2.Ensure that the server is properly grounded.

3.Grip the bezel at the two finger holds and rotate it down to its open position

4.Disconnect the bezel cables (the server status indicator cable and the alarm LED cable) connecting the bezel assembly to the server

5.Unscrew and remove the bezel screws from the bezel hinges.

6.Lift and pull the bezel forward to remove it from the server

 

Installing the Bezel Assembly


1.Mount the new bezel and hinges onto the server


2.Secure the bezel assembly to the server using the screws.


3.Reconnect the bezel cables


4.Close the bezel assembly.


5.Power on the server.

 

WHAT ACTIONS ARE REQUIRED TO RETURN THE SYSTEM TO AN OPERATIONAL STATE:

Restart software applications per applicable administration guides to resume system operation.

PARTS NOTE:

https://support.oracle.com/handbook_private/Systems/Netra_240/components.html

https://support.oracle.com/handbook_private/Systems/Netra_240_R/components.html



ADDITIONAL COMMENTS:

Please refer to the Netra 240 Server Service Manual: http://docs.oracle.com/cd/E19102-01/n240.srvr/817-2699-13/817-2699-13.pdf


Attachments
This solution has no attachment
  Copyright © 2018 Oracle, Inc.  All rights reserved.
 Feedback