Asset ID: |
1-71-1365521.1 |
Update Date: | 2017-11-30 |
Keywords: | |
Solution Type
Technical Instruction Sure
Solution
1365521.1
:
How to Remove and Replace a V210/V240 Front Bezel Assembly:ATR:1365521.1:1
Related Items |
- Sun Fire V240 Server
- Sun Fire V210 Server
|
Related Categories |
- PLA-Support>Sun Systems>Sun_Other>Sun Collections>SN-OTH: SPARC-CAP VCAP
|
In this Document
Oracle Confidential PARTNER - Available to partners (SUN).
Reason: FRU CAP
Applies to:
Sun Fire V210 Server - Version Not Applicable to Not Applicable [Release N/A]
Sun Fire V240 Server - Version Not Applicable to Not Applicable [Release N/A]
Information in this document applies to any platform.
Goal
How to Remove and Replace a V210/V240 Front Bezel Assembly
********************************************************************************
To report errors or request improvements on this procedure,
please go to http://support.us.oracle.com and Add a comment for Doc ID: 1365521.1
********************************************************************************
Solution
DISPATCH INSTRUCTIONS
- WHAT SKILLS DOES THE ENGINEER NEED:
V210/V240 server product training
- TIME ESTIMATE: 240 minutes
- TASK COMPLEXITY: 1
FIELD ENGINEER INSTRUCTIONS:
- PROBLEM OVERVIEW:
Front bezel assembly not working
- WHAT ACTION DOES THE ENGINEER NEED TO TAKE:
The front bezel assembly includes the bezel, the front server status indicators, and hinges. It is replaced as a single unit.
Removing the Front Bezel Assembly:
1.Power off the server.
2.Ensure the server is properly grounded.
3.Hold the bezel firmly at both ends and rotate it down to its open position.
Grip the bezel at the points marked by the green triangles at each end to open it.
Do not attempt to open the bezel using a single gripping point or by holding the middle of the bezel as damage may occur.
4.Disconnect the cable connecting the bezel assembly to the server.
5.Unscrew the bezel hinges and remove them from the server.
Installing the new Front Bezel Assembly
1.Locate the new bezel and hinges onto the server and screw them to the server.
2.Reconnect the bezel cable.
OBTAIN CUSTOMER ACCEPTANCE:
- WHAT ACTION DOES THE CUSTOMER NEED TO TAKE TO RETURN THE SYSTEM TO AN OPERATIONAL STATE:
Follow the start-up procedure as prepared by sys-admin. Customer should verify system is stable for return to production.
PARTS NOTE:
https://support.oracle.com/handbook_partner/Systems/SunFireV240/components.html
https://support.oracle.com/handbook_partner/Systems/SunFireV240_R/components.html
https://support.oracle.com/handbook_partner/Systems/SunFireV210/components.html
https://support.oracle.com/handbook_partner/Systems/SunFireV210_R/components.html
REFERENCE INFORMATION:
Refer to Service Manual and Admin Guide:
http://download.oracle.com/docs/cd/E19088-01/v240.srvr/819-4207-10/819-4207-10.pdf
Attachments
This solution has no attachment