Asset ID: |
1-71-1347583.1 |
Update Date: | 2018-02-27 |
Keywords: | |
Solution Type
Technical Instruction Sure
Solution
1347583.1
:
How to Remove and Replace VLE JBOD Power Supply and Fan Assembly:ATR:2325:2
Related Items |
- Sun Virtual Library Extension (VLE)
|
Related Categories |
- PLA-Support>Sun Systems>Sun_Other>Sun Collections>SN-OTH: TAPE-CAP VCAP
|
In this Document
Oracle Confidential PARTNER - Available to partners (SUN).
Reason: FRU CAP
Applies to:
Sun Virtual Library Extension (VLE) - Version 1.0 and later
Information in this document applies to any platform.
Goal
How to Remove and Replace VLE JBOD PS and Fan Assembly
Solution
CAP PROBLEM OVERVIEW: Servicing Power Supply and Fan
DISPATCH INSTRUCTIONS
WHAT SKILLS DOES THE ENGINEER NEED:(IS A SITE ENGINEER AVAILABLE?)
Trained on J4400 and VLE
TIME ESTIMATE: 150 minutes
TASK COMPLEXITY: 2
FIELD ENGINEER INSTRUCTIONS
WHAT STATE SHOULD THE SYSTEM BE IN TO BE READY TO PERFORM THE RESOLUTION ACTIVITY? :
J4400 Array contains two hot-swappable, redundant power supplies. If one power supply is turned off or malfunctions, other power supply maintains electrical power
Take ESD Precautions
WHAT ACTION DOES THE ENGINEER NEED TO TAKE:
Removing Power Supply
Locate respective disk tray and failed power supply
Ensure the power supply on/off switch is in the “O” position
Disconnect the power cord tie strap
Unplug the power cord from the power supply
Using your thumb and forefinger, unscrew both ejection arm captive screws until loose and swing the ejection arms out until they are fully open
Pull the power supply out of the tray(careful to not damage the circuit board connector)
Replacing Power Supply
Unscrew both power supply ejection arm captive screws and swing the ejection arms out until they are fully open
Slide the new power supply into the tray slot until it contacts the chassis backplane and the ejection arms begin to swing closed
Push the ejection arms closed fully and secure both captive screws to seat and secure the power supply in the tray
Ensure the power supply on/off switch is in the “O” position
Plug the power cord into the new power supply and attach the power cord tie strap to the power cord
Verify
Place the power supply on/off switch to the “I” position and verify the Power status LED is steady green and the Power fault LED and the Fan fault LED are off
OBTAIN CUSTOMER ACCEPTANCE
WHAT ACTION DOES THE CUSTOMER NEED TO TAKE TO RETURN THE SYSTEM TO AN OPERATIONAL STATE:
PARTS NOTE:
REFERENCE INFORMATION:
http://download.oracle.com/docs/cd/E19928-01/820-3228-10/820-3228-10.pdf
StorageTek Virtual Library Extension 1.0 Customer Documentation Library
http://download.oracle.com/docs/cd/E19853-01/index.html
For replacing a power supply for a DE2-24C, reference the following document.
https://docs.oracle.com/cd/E51475_01/html/E52874/maintenance__hardware__procedures__shelf__tasks.html#ZFSREmaintenance__hardware__procedures__shelf__replacing_a_power_supply
Attachments
This solution has no attachment